Capstone College of Nursing Addition and Renovation
- 650 University Boulevard East
Use
Academic
Status
Active
Construction Type
Renovation and Addition
Current Phase
Design
College or Division
Capstone College of Nursing
CA Filing Code
010-25-4110
Project GSF
81,275
Bid Date
TBD
Construction Start
TBD
Construction End
TBD
Project Architect
TurnerBatson Architects
General Contractor
TBD
Project Manager
Suzanne Webster
The Capstone College of Nursing Addition and Renovation project (“Project”) will include the renovation of approximately 31,175 existing gross square feet (“GSF”) within the Capstone College of Nursing, as well as the construction of a 50,100 GSF addition that will support the program expansion for a total project of approximately 81,275 GSF.
The Project will include research space, classrooms, clinical spaces, offices, and appropriate service and support space. Modified mechanical, plumbing, electrical and life safety systems, and all University-standard enterprise systems such as networking, access control and security, and audio-visual technology will be provided to support the academic mission of the college.
A Pedestrian Bridge is proposed as part of the Project to allow for safer access for the students, faculty, and staff who walk to and from DCH Regional Medical Center, where portions of the required curriculum take place.
BOT Budget
$80,750,000
Funding Sources
-
Future General Revenue Bonds :
$67,041,068 -
University Central Reserves :
$13,708,932
| STAGE | PACKAGE INFORMATION |
|---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
| DATA LABEL | DATA VALUE |
|---|---|
| Category | Academic |
| College/Division | Capstone College of Nursing |
| Status | Active |
| Construction Phase | Design |
| Construction Type | Renovation and Addition |
| Street Address | 650 University Boulevard East |
| Zone | |
| GSF | 81,275 |
| Project Number | 010-25-4110 |
| Architect | TurnerBatson Architects |
| General Contractor | TBD |
| Project Manager | Suzanne Webster |
| Project Admin | |
| Field Coordinator | |
| Interior Designer | |
| Bid Date | TBD |
| Construction Start | TBD |
| Scheduled Construction End | TBD |
| COSC Date | |
| Year End Inspection | |
| Fundraising Site | |
| SharePoint Active Project Site Link | |
| AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX |
| Campus Map Link | |
| BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
| Closeout Documents Link | |
| View Warranty Documents | |
| Project Summary |
The Capstone College of Nursing Addition and Renovation project (“Project”) will include the renovation of approximately 31,175 existing gross square feet (“GSF”) within the Capstone College of Nursing, as well as the construction of a 50,100 GSF addition that will support the program expansion for a total project of approximately 81,275 GSF. The Project will include research space, classrooms, clinical spaces, offices, and appropriate service and support space. Modified mechanical, plumbing, electrical and life safety systems, and all University-standard enterprise systems such as networking, access control and security, and audio-visual technology will be provided to support the academic mission of the college. A Pedestrian Bridge is proposed as part of the Project to allow for safer access for the students, faculty, and staff who walk to and from DCH Regional Medical Center, where portions of the required curriculum take place. |
| Renderings | |
| Budget | 80750000 |
| Banner Fund Number | |
| Project Accountant | |
| Funding Source(s) | |
| Construction Dashboard Link | |
| Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
| View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
| Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
| Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
| ePIRPAF Link | |
| Stage 1 BOT Submittal(s) | |
| Stage 2 BOT Submittal(s) | |
| Stage 3 BOT Submittal(s) | |
| Stage 4 BOT Submittal(s) | |
| BOT Site | |
| RFQ Documents | |
| Advertisement for Bids | |
| Bid Tabulations | |
| Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
| Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
| Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
| Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
| Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
| 360 Embed Code | |
| BOT Stage |