Student Recreation Court Expansion
- 550 Peter Bryce Blvd
Use
Other
Status
Active
Construction Type
Addition
Current Phase
Bid
College or Division
Division of Student Life
CA Filing Code
372-25-3847
Project Architect
HNP Landscape Architecture
Project Manager
Leila Ahmady
Project Admin
Ambria Carter
The Student Recreation Court Expansion project at 550 Peter Bryce Blvd will expand the recreation court facility to address the increasing demand. The Project will add up to ten new courts adjacent to the outdoor recreation space to reduce existing long wait times for court play. The new courts will include appropriate lighting, access, and security.
The bid documents will include progressive alternates to maximize the number of courts that can be added to maximize value and funds available.
BOT Budget
$1,635,898
Funding Sources
-
Education Trust Fund Advancement and Technology Fund Supplemental Appropriation Act #2024-429 (HB 147) :
$1,635,898
Banner/Project #
91306
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Other |
College/Division | Division of Student Life |
Status | Active |
Construction Phase | Bid |
Construction Type | Addition |
GSF | |
Street Address | 550 Peter Bryce Blvd |
Zone | |
Project Number | 372-25-3847 |
Architect | HNP Landscape Architecture |
Project Manager | Leila Ahmady |
Project Admin | Ambria Carter |
Field Coordinator | |
General Contractor | |
Interior Designer | |
Bid Date | |
Construction Start | |
Scheduled Construction End | |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/372-25-3847 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91306 |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Student Recreation Court Expansion project at 550 Peter Bryce Blvd will expand the recreation court facility to address the increasing demand. The Project will add up to ten new courts adjacent to the outdoor recreation space to reduce existing long wait times for court play. The new courts will include appropriate lighting, access, and security. The bid documents will include progressive alternates to maximize the number of courts that can be added to maximize value and funds available. |
Renderings | |
Budget | 1635898 |
Banner Fund Number | 91306 |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |