Student Recreation Court Expansion

  • 550 Peter Bryce Blvd
Information at a Glance

Use

Other

Status

Active

Construction Type

Addition

Current Phase

Bid

College or Division

Division of Student Life

CA Filing Code

372-25-3847

Project Architect

HNP Landscape Architecture

Project Manager

Leila Ahmady

Project Admin

Ambria Carter

Project Summary

The Student Recreation Court Expansion project at 550 Peter Bryce Blvd will expand the recreation court facility to address the increasing demand. The Project will add up to ten new courts adjacent to the outdoor recreation space to reduce existing long wait times for court play. The new courts will include appropriate lighting, access, and security.

The bid documents will include progressive alternates to maximize the number of courts that can be added to maximize value and funds available.


Information at a Glance

BOT Budget

$1,635,898

Funding Sources

  • Education Trust Fund Advancement and Technology Fund Supplemental Appropriation Act #2024-429 (HB 147) :
    $1,635,898

Banner/Project #

91306

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Other
College/Division Division of Student Life
Status Active
Construction Phase Bid
Construction Type Addition
GSF
Street Address 550 Peter Bryce Blvd
Zone
Project Number 372-25-3847
Architect HNP Landscape Architecture
Project Manager Leila Ahmady
Project Admin Ambria Carter
Field Coordinator
General Contractor
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/372-25-3847
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91306
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Student Recreation Court Expansion project at 550 Peter Bryce Blvd will expand the recreation court facility to address the increasing demand. The Project will add up to ten new courts adjacent to the outdoor recreation space to reduce existing long wait times for court play. The new courts will include appropriate lighting, access, and security.

The bid documents will include progressive alternates to maximize the number of courts that can be added to maximize value and funds available.

Renderings
Budget 1635898
Banner Fund Number 91306
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage