RISE Center Playscape Renovations & Enhancements

  • 600 Johnny Stallings Dr
Information at a Glance

Use

Other

Status

Fundraising

Construction Type

Renovation

Current Phase

Design

College or Division

College of Human and Environmental Sciences

CA Filing Code

017-24-3587

Project GSF

22,000

Project Architect

HNP Landscape Architecture

Project Manager

Leila Ahmady

Project Summary

The RISE Center Playscape Renovations & Enhancements Project (“Project”) is a full overhaul of the existing playground areas at the RISE Center and is necessary to continue to fulfill the center’s mission of a blended learning environment where all kids shine. The current playground is not 100% accessible for all of the children at RISE, and this project will provide an opportunity for a state-of-the-art space for our children to thrive but to also be a model program for the Country when it comes to true accessibility for all levels of ability.

This Project will include therapeutic, fully accessible infant, toddler and preschool yards for the children and additional landscaping.

The Project is key to enhancing the experience of the children and their families of the center.

The Project will also address drainage issues in the exterior playground areas.

Advancement and the College will pursue funds for both the overall Project and the individual playscape components as illustrated in the construction packages included in the Total Project Budget above. The University will execute on the Project either as individual packages or comprehensively in conjunction with realized fundraising.

All Construction Packages include the associated playscape equipment as it will be installed integral with the work and will be included in the related package bids.


Information at a Glance

BOT Budget

$3,000,000.00

Funding Sources

  • Future Gifts :
    $2,400,000
  • Office of Academic Affairs Reserve :
    $600,000

Banner/Project #

99086

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Other
College/Division College of Human and Environmental Sciences
Status Fundraising
Construction Phase Design
Construction Type Renovation
GSF 22,000
Street Address 600 Johnny Stallings Dr
Zone
Project Number 017-24-3587
Architect HNP Landscape Architecture
Project Manager Leila Ahmady
Project Admin
Field Coordinator
General Contractor
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/017-24-3587
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=99086
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The RISE Center Playscape Renovations & Enhancements Project (“Project”) is a full overhaul of the existing playground areas at the RISE Center and is necessary to continue to fulfill the center’s mission of a blended learning environment where all kids shine. The current playground is not 100% accessible for all of the children at RISE, and this project will provide an opportunity for a state-of-the-art space for our children to thrive but to also be a model program for the Country when it comes to true accessibility for all levels of ability.

This Project will include therapeutic, fully accessible infant, toddler and preschool yards for the children and additional landscaping.

The Project is key to enhancing the experience of the children and their families of the center.

The Project will also address drainage issues in the exterior playground areas.

Advancement and the College will pursue funds for both the overall Project and the individual playscape components as illustrated in the construction packages included in the Total Project Budget above. The University will execute on the Project either as individual packages or comprehensively in conjunction with realized fundraising.

All Construction Packages include the associated playscape equipment as it will be installed integral with the work and will be included in the related package bids.

Renderings
Budget 3000000
Banner Fund Number 99086
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage