Peter Bryce Main Renovation

  • Peter Bryce Campus
Information at a Glance

Use

Academic

Status

Active

Construction Type

Renovation

Current Phase

Construction

College or Division

College of Arts and Sciences

CA Filing Code

415-21-2548

Project GSF

117,352

Bid Date

September 7, 2023

Construction Start

February 2022

Construction End

November 2024

Project Architect

TurnerBatson Architects

General Contractor

J. T. Harrison Construction Co., Inc.

Project Manager

Austin Fisher

Field Coordinator

Lee Orr

Project Admin

Allie Price

Project Summary

Bryce Main – restoring the past, reimagining the future.

Recognizing the caliber of the performing arts at UA, the University is writing a new script and reimagining the role of Bryce Main. This transformation will reenergize and reimagine this historic facility, allowing it to not only be an important part in the story of how campus developed in the past but also how campus will grow in the future. Paying careful attention to replicate existing details and elements of the original architecture, the University is renovating the main hospital building to include the University welcome center, reception venue and associated office and administrative space. The building will also house faculty offices and rehearsal space for Theatre and Dance, as well as museums dedicated to both University history and the history of mental health in Alabama.

Evolutia Historic Project Video

Yellowhammer News – First Look at the Catherine and Pettus Randall Welcome Center


Information at a Glance

BOT Budget

$94,693,000.00

Funding Sources

  • 2014 General Revenue Bonds :
    $27,646,584
  • 2017 General Revenue Bonds :
    $998,874
  • 2019 General Revenue Bonds :
    $33,266,420
  • Public School and College Authority :
    $21,838,122
  • University Central Reserves :
    $10,943,000

Banner/Project #

90937

Project Accountant

Kimberly Lee

DATA LABEL DATA VALUE
Category Academic
Status Active
Construction Phase Construction
Construction Type Renovation
GSF 117,352
Street Address Peter Bryce Campus
Zone 3
Project Number 415-21-2548
Architect TurnerBatson Architects
Project Manager Austin Fisher
General Contractor J. T. Harrison Construction Co., Inc.
Bid Date September 7, 2023
Construction Start February 2022
Scheduled Construction End November 2024
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/415-21-2548
Campus Map Link https://map.concept3d.com/?id=1222#!m/500804
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Project Summary

Bryce Main – restoring the past, reimagining the future.

Recognizing the caliber of the performing arts at UA, the University is writing a new script and reimagining the role of Bryce Main. This transformation will reenergize and reimagine this historic facility, allowing it to not only be an important part in the story of how campus developed in the past but also how campus will grow in the future. Paying careful attention to replicate existing details and elements of the original architecture, the University is renovating the main hospital building to include the University welcome center, reception venue and associated office and administrative space. The building will also house faculty offices and rehearsal space for Theatre and Dance, as well as museums dedicated to both University history and the history of mental health in Alabama.

Evolutia Historic Project Video

Yellowhammer News – First Look at the Catherine and Pettus Randall Welcome Center

Renderings
Budget 94693000
Banner Fund Number 90937
Project Accountant Kimberly Lee
Funding Source 1
Funding Source 1 Amount
Funding Source 2
Funding Source 2 Amount
Funding Source 3
Funding Source 3 Amount
Funding Source 4
Funding Source 4 Amount
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=0C8A609B-63E2-436F-AA26-058D254D42B6
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=90630&detail=all
View Bid Tab https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Peter-Bryce-Main-Interior-Demolition-and-Abatement-415-14-172A-4-2-15.pdf
BOT Stage I June 2013
BOT Stage II June 2014, September 2014, February 2015
BOT Stage III NA
BOT Stage IV April 2015 (NTE)
Stage 1 Submittal PDF
Stage 2 Submittal PDF
Stage 3 Submittal PDF
Stage 4 Submittal PDF
BOT Site https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-159/
College/Division College of Arts and Sciences
Project Admin Allie Price
Field Coordinator Lee Orr
COSC Date
Year End Inspection
View Warranty Documents
Interior Designer
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90937
Construction Photos Link
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
Attachment I
CSP I PDF
CSP II PDF
BOT Info Item PDF
Stage 1 Package Fields
Funding Source(s)
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
Fundraising Site https://www.ua.edu/performingarts/
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
Closeout Documents Link
RFQ Documents
Advertisement for Bids
Bid Tabulations
360 Embed Code
BOT Stage