2nd Avenue Overpass
- NA
Use
Road
Status
Construction Type
New Construction
Current Phase
Closeout
College or Division
Division of Finance and Operations
CA Filing Code
TRN-17-1106
Project GSF
NA
Bid Date
December 19, 2019
Construction Start
March 2020
Construction End
August 2, 2021
COSC Date
' August 3, 2021
Project Architect
McGiffert and Associates
General Contractor
Brasfield & Gorrie
Project Manager
David Welch (8-8843)
Field Coordinator
Hilton McClain
Interior Designer
NA
Project Admin
Cassidy Largin
Currently, over 70,000 vehicles cross the train tracks running along the south edge of campus every day. Right now, there are 2 ways in and out of campus that go over the train tracks, and they’re on the outer edges of campus. The 2nd Avenue Overpass project will form uninterrupted connection from 15th Street to Paul W. Bryant Drive, creating a new, centrally located corridor into campus that won’t be hampered by the train tracks. This new road into campus will be especially helpful for access to DCH, emergency response and traffic flow during campus events. It will also be pedestrian and bike friendly. A 10’ wide bike/walking path with a concrete barrier will be included in the project, along with plenty of lighting.
View Progress Photos!
2nd Avenue Overpass Progress Footage
BOT Budget
$20,926,130.00
Funding Sources
-
Plant Funds :
$14,900,473 -
INFRA Grant :
$6,025,657
Banner/Project #
94996
Project Accountant
Demon Patrick (8-8714)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
December 11, 2018
Medium Voltage Underground Power Conversion Package -
January 22, 2019
14th Street Partial Demo and Renovation -
December 19, 2019
Construction Package
DATA LABEL | DATA VALUE |
---|---|
Category | Road |
Status | Active |
Construction Phase | Closeout |
Construction Type | New Construction |
GSF | NA |
Bid Date | December 19, 2019 |
Project Number | TRN-17-1106 |
Architect | McGiffert and Associates |
Project Manager | David Welch (8-8843) |
General Contractor | Brasfield & Gorrie |
Project Summary |
Currently, over 70,000 vehicles cross the train tracks running along the south edge of campus every day. Right now, there are 2 ways in and out of campus that go over the train tracks, and they’re on the outer edges of campus. The 2nd Avenue Overpass project will form uninterrupted connection from 15th Street to Paul W. Bryant Drive, creating a new, centrally located corridor into campus that won’t be hampered by the train tracks. This new road into campus will be especially helpful for access to DCH, emergency response and traffic flow during campus events. It will also be pedestrian and bike friendly. A 10’ wide bike/walking path with a concrete barrier will be included in the project, along with plenty of lighting. View Progress Photos! 2nd Avenue Overpass Progress Footage
|
Renderings | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/7M27T/TRN-17-1106/default.aspx |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/413860 |
BIR Building Link | |
Budget | 20926130 |
Banner Fund Number | 94996 |
Project Accountant | Demon Patrick (8-8714) |
Funding Source 1 | |
Funding Source 1 Amount | |
Funding Source 2 | |
Funding Source 2 Amount | |
Funding Source 3 | |
Funding Source 3 Amount | |
Funding Source 4 | |
Funding Source 4 Amount | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=03CCA791-7B61-4899-B56C-CD22A37AC1B5 |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=94996&detail=all |
BOT Stage I | November 2016 |
BOT Stage II | February 2017 |
BOT Stage III | June 2017 |
BOT Stage IV | February 2019 (Sitework) |
Stage 1 Submittal PDF | |
Stage 2 Submittal PDF | |
Stage 3 Submittal PDF | |
Stage 4 Submittal PDF | |
BOT Site | https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-196/ |
Zone | 6 |
Street Address | NA |
View Bid Tab | https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/2nd-Avenue-Overpass-Project-UA-Medium-UG-Power-Conversion-Package-TRN-17-1106-12-11-18.pdf |
Construction Start | March 2020 |
Scheduled Construction End | August 2, 2021 |
College/Division | Division of Finance and Operations |
Project Admin | Cassidy Largin |
Field Coordinator | Hilton McClain |
COSC Date | August 3, 2021 |
Year End Inspection | TBD |
View Warranty Documents | |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=94996 |
Parking Spaces | |
Interior Designer | NA |
Construction Photos Link | |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Attachment I | |
CSP I PDF | |
CSP II PDF | |
BOT Info Item PDF | |
Stage 1 Package Fields | |
Funding Source(s) | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
Fundraising Site | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bid/bid-opening-2nd-avenue-overpass-project-trn-17-1106/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code |