Bryant-Denny Stadium Renovation and Addition

  • 920 Paul Bryant Drive, Tuscaloosa, Alabama 35401
Information at a Glance

Use

Athletics

Status

Active

Construction Type

Renovation

Current Phase

Closeout

College or Division

Intercollegiate Athletics

CA Filing Code

046-18-1816

Project GSF

109,060

Bid Date

08/15/2019

Construction Start

December 2019

Construction End

August 2020

COSC Date

' 09/30/2020

Project Architect

Davis Architects

General Contractor

Caddell Construction

Project Manager

Craig Harris (8-5950)

Field Coordinator

Al Stewart

Interior Designer

TBD

Project Admin

Admin

Project Summary

Alabama Athletics is committed to providing the highest quality game-day experience for everyone attending an event at Bryant-Denny Stadium. Every renovation or expansion of Bryant-Denny has provided additional opportunities for an enhanced game-day experience.

Bryant-Denny Stadium is one of the most iconic facilities on The University of Alabama campus and, as such, will be among the featured capital projects in The Crimson Standard.

Enhancements to Bryant-Denny Stadium will include:

  • Renovation and expansion of multiple seating areas to include three new club areas and the addition of 3,826 new premium seats
  • The addition of Loge Boxes, new skyboxes on the east U1 level and west side Founders Suites, as well as a complete renovation of all existing skyboxes
  • A relocated press box
  • Improvements to all team areas including the locker room and tunnel
  • Renovated recruiting areas
  • Expanded concourses to allow for better traffic flow as all fans enter and exit the stadium
  • Renovated concession areas and main concourses to provide an improved game-day experience for fans at Bryant-Denny Stadium

**All renderings of construction projects are subject to approval by the Board of Trustees of The University of Alabama and may change at any time.


Information at a Glance

BOT Budget

$109,438,587.00

Funding Sources

  • 2019 General Revenue Bonds :
    $48,458,213
  • Crimson Standard Cash :
    $38,438,587
  • Internal University Loan :
    $22,541,787

Banner/Project #

90850

Project Accountant

Sherell Harrison (8-6838)

Request for Qualifications
Bid Information
Bid Package Important Dates Bid Documents
Package A - Elevator Prequalifications Due:
Mandatory Pre-bid Conference:
Mandatory Pre-bid Conference Location: Procurement Services Annex
Bid Opening: July 25, 2019 2:00 pm
Bid Opening Location: Facilities Admin Building
Package B - Renovation Prequalifications Due:
Mandatory Pre-bid Conference:
Mandatory Pre-bid Conference Location: Procurement Services Annex
Bid Opening: August 15, 2019 3:00 pm
Bid Opening Location: Procurement Services Annex
PROJECT BID TABS
DATA LABEL DATA VALUE
Category Athletics
Status Active
Construction Phase Closeout
Construction Type Renovation
GSF 109,060
Bid Date 08/15/2019
Project Number 046-18-1816
Architect Davis Architects
Project Manager Craig Harris (8-5950)
General Contractor Caddell Construction
Project Summary

Alabama Athletics is committed to providing the highest quality game-day experience for everyone attending an event at Bryant-Denny Stadium. Every renovation or expansion of Bryant-Denny has provided additional opportunities for an enhanced game-day experience.

Bryant-Denny Stadium is one of the most iconic facilities on The University of Alabama campus and, as such, will be among the featured capital projects in The Crimson Standard.

Enhancements to Bryant-Denny Stadium will include:

  • Renovation and expansion of multiple seating areas to include three new club areas and the addition of 3,826 new premium seats
  • The addition of Loge Boxes, new skyboxes on the east U1 level and west side Founders Suites, as well as a complete renovation of all existing skyboxes
  • A relocated press box
  • Improvements to all team areas including the locker room and tunnel
  • Renovated recruiting areas
  • Expanded concourses to allow for better traffic flow as all fans enter and exit the stadium
  • Renovated concession areas and main concourses to provide an improved game-day experience for fans at Bryant-Denny Stadium

**All renderings of construction projects are subject to approval by the Board of Trustees of The University of Alabama and may change at any time.

Renderings
SharePoint Active Project Site Link https://uafinancialaffairs.sharepoint.com/sites/9VD1V/046-18-1816/
Campus Map Link https://map.concept3d.com/?id=1222#!m/359886
BIR Building Link https://uafinancialaffairs.sharepoint.com/sites/98C3D/Zone7/buildings/046
Budget 109438587
Banner Fund Number 90850
Project Accountant Sherell Harrison (8-6838)
Funding Source 1
Funding Source 1 Amount
Funding Source 2
Funding Source 2 Amount
Funding Source 3
Funding Source 3 Amount
Funding Source 4
Funding Source 4 Amount
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=E0530352-ED93-4473-A3DC-4C38EBE30E74
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=90850&detail=all
BOT Stage I September 2018
BOT Stage II September 2018 (W)
BOT Stage III June 2019 (RS&B)
BOT Stage IV June 2019 (NTE)
Stage 1 Submittal PDF
Stage 2 Submittal PDF
Stage 3 Submittal PDF
Stage 4 Submittal PDF
BOT Site https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-200/default.aspx
Zone 7
Street Address 920 Paul Bryant Drive, Tuscaloosa, Alabama 35401
View Bid Tab https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Bryant-Denny-Stadium-Renovation-and-Addition-046-18-1816B.pdf
Construction Start December 2019
Scheduled Construction End August 2020
College/Division Intercollegiate Athletics
Project Admin Admin
Field Coordinator Al Stewart
COSC Date 09/30/2020
Year End Inspection
View Warranty Documents
Interior Designer TBD
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90850
Construction Photos Link
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
Attachment I
CSP I PDF
CSP II PDF
BOT Info Item PDF
Stage 1 Package Fields
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
Funding Source(s)
Fundraising Site http://crimsontidefoundation.org
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
Advertisement for Bids
Closeout Documents Link
RFQ Documents
Bid Tabulations
360 Embed Code