Math and Science Education Building Renovation
- 411 Hackberry Lane, Tuscaloosa, Alabama 35487
Use
Academic
Status
Construction Type
Renovation
Current Phase
Complete
College or Division
College of Arts and Sciences
CA Filing Code
034-19-2011
Project GSF
95,635
Bid Date
January 7, 2020
Construction Start
November 2019
Construction End
January 2021
COSC Date
' December 12, 2020
Project Architect
KPS Group, Inc.
General Contractor
J. T. Harrison Construction*
Project Manager
Mason Milner / Joshua Bollinger
Field Coordinator
Ed Sawyer (8-1684)
Interior Designer
Michael Hand (8-8456)
Project Admin
Samantha Woods
This project will involve the renovation of the main building as well as improvements to the Auditorium. Most of the project will focus on the interior of the building; however, the windows will be replaced and the openings will be reworks to be more consistent with campus architecture.
This project will support the relocation of the Math Technology Learning Center (MTLC) and will accommodate introductory laboratories for Physics, Astronomy, Geography, Geology, and New College.
The 3rd and 4th floors will be repurposed to accommodate the MTLC, made necessary by the demolition of the Tutwiler Annex, which is the MTLC’s current location.
New spaces will accommodate a studio format, which integrates lectures and labs for a more efficient and valuable academic experience.
BOT Budget
$25,148,051.00
Funding Sources
-
2019 General Revenue Bonds :
$25,148,051
Banner/Project #
90838
Project Accountant
Sherell Harrison (8-6838)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
October 15, 2019
Demolition and Abatement Package -
January 9, 2020
Construction Package
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
Status | Active |
Construction Phase | Complete |
Construction Type | Renovation |
GSF | 95,635 |
Bid Date | January 7, 2020 |
Project Number | 034-19-2011 |
Architect | KPS Group, Inc. |
Project Manager | Mason Milner / Joshua Bollinger |
General Contractor | J. T. Harrison Construction* |
Project Summary |
This project will involve the renovation of the main building as well as improvements to the Auditorium. Most of the project will focus on the interior of the building; however, the windows will be replaced and the openings will be reworks to be more consistent with campus architecture. This project will support the relocation of the Math Technology Learning Center (MTLC) and will accommodate introductory laboratories for Physics, Astronomy, Geography, Geology, and New College. The 3rd and 4th floors will be repurposed to accommodate the MTLC, made necessary by the demolition of the Tutwiler Annex, which is the MTLC’s current location. New spaces will accommodate a studio format, which integrates lectures and labs for a more efficient and valuable academic experience. |
Renderings | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/034-19-2011/SitePages/Home.aspx |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/416113 |
BIR Building Link | https://uafinancialaffairs.sharepoint.com/sites/98C3D/Zone1/buildings/034 |
Budget | 25148051 |
Banner Fund Number | 90838 |
Project Accountant | Sherell Harrison (8-6838) |
Funding Source 1 | |
Funding Source 1 Amount | |
Funding Source 2 | |
Funding Source 2 Amount | |
Funding Source 3 | |
Funding Source 3 Amount | |
Funding Source 4 | |
Funding Source 4 Amount | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=00FE5DDC-CD66-4618-BD50-B532D4C4BE6F |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90838&detail=all |
BOT Stage I | April 2019 |
BOT Stage II | June 2019 |
BOT Stage III | September 2019 |
BOT Stage IV | November 2019 |
Stage 1 Submittal PDF | |
Stage 2 Submittal PDF | |
Stage 3 Submittal PDF | |
Stage 4 Submittal PDF | |
BOT Site | https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-193/ |
Zone | |
Street Address | 411 Hackberry Lane, Tuscaloosa, Alabama 35487 |
View Bid Tab | |
Construction Start | November 2019 |
Scheduled Construction End | January 2021 |
College/Division | College of Arts and Sciences |
Project Admin | Samantha Woods |
Field Coordinator | Ed Sawyer (8-1684) |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90838 |
COSC Date | December 12, 2020 |
Year End Inspection | TBD |
View Warranty Documents | |
Parking Spaces | |
Interior Designer | Michael Hand (8-8456) |
Construction Photos Link | |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Attachment I | |
CSP I PDF | |
CSP II PDF | |
BOT Info Item PDF | |
Stage 1 Package Fields | |
Funding Source(s) | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
Fundraising Site | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bid/bid-opening-math-science-education-building-renovation-pkg-b-034-19-2011b/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code |