Capstone College of Nursing Addition
- 650 University Boulevard East, Tuscaloosa, AL 35401
Use
Academic
Status
Construction Type
Addition
Current Phase
Complete
College or Division
College of Nursing
CA Filing Code
010-18-1591
Project GSF
32,000
Bid Date
12/5/2019
Construction Start
January 2020
Construction End
12/01/2020
Project Architect
Turner Batson
General Contractor
Harrison Construction*
Project Manager
Suzanne Webster (8-6907)
Field Coordinator
Shane Peacock
Interior Designer
Laura Nichols (8-7269)
Project Admin
Haley Johnson
The Capstone College of Nursing (CCN) Addition project involves a three-story addition to the west side of the existing facility which is also reflected in the 2017 Master Plan. The 32,000-square foot (SF) addition has been programmed with the goal of enhancing the functionality of the existing program as well as adding the necessary features to accommodate the expected growth and teaching needs of the nursing program, which is well beyond the current capacity of the existing 60,271 SF building.
The original building was designed to accommodate this proposed expansion. Therefore, the existing chiller yard has space and connections for the new equipment that is required for the addition. Also, mechanical piping, electrical conduit and connection points were previously installed in the original construction to minimize the impact to the existing building during construction of the addition.
The proposed Project entails two 150-seat multi-use classrooms, individual study areas, a Home Healthcare Lab suite, practicum lab, examination rooms, conference rooms, faculty/staff offices, student work areas and other supporting areas. Also included is an exterior terrace of approximately 2,400 SF.
BOT Budget
$14,362,000.00
Funding Sources
-
2019 General Revenue Bonds :
$8,237,024 -
University Plant Reserves :
$4,124,976 -
Capstone College of Nursing Reserves :
$2,000,000
Banner/Project #
90817
Project Accountant
Demon Patrick (8-8714)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Budget | 14362000 |
Category | Academic |
Status | Active |
GSF | 32,000 |
Bid Date | 12/5/2019 |
Construction Phase | Complete |
Construction Type | Addition |
BOT Stage I | February 2018 |
BOT Stage II | February 2018 (Waiver) |
BOT Stage III | April 2018 |
BOT Stage IV | February 2020 |
Project Number | 010-18-1591 |
Architect | Turner Batson |
Project Manager | Suzanne Webster (8-6907) |
General Contractor | Harrison Construction* |
Project Accountant | Demon Patrick (8-8714) |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90817&detail=all |
Project Summary |
The Capstone College of Nursing (CCN) Addition project involves a three-story addition to the west side of the existing facility which is also reflected in the 2017 Master Plan. The 32,000-square foot (SF) addition has been programmed with the goal of enhancing the functionality of the existing program as well as adding the necessary features to accommodate the expected growth and teaching needs of the nursing program, which is well beyond the current capacity of the existing 60,271 SF building. The original building was designed to accommodate this proposed expansion. Therefore, the existing chiller yard has space and connections for the new equipment that is required for the addition. Also, mechanical piping, electrical conduit and connection points were previously installed in the original construction to minimize the impact to the existing building during construction of the addition. The proposed Project entails two 150-seat multi-use classrooms, individual study areas, a Home Healthcare Lab suite, practicum lab, examination rooms, conference rooms, faculty/staff offices, student work areas and other supporting areas. Also included is an exterior terrace of approximately 2,400 SF. |
SharePoint Active Project Site Link | https://uafinancialaffairs.sharepoint.com/sites/7M27T/010-18-1591/ |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/353837 |
BIR Building Link | https://uafinancialaffairs.sharepoint.com/sites/98C3D/Zone5/buildings/010/ |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=043BBA00-6565-4B12-B364-3305C504CD0A |
BOT Site | https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-181/ |
Stage 1 Submittal PDF | |
Banner Fund Number | 90817 |
Funding Source 1 | |
Funding Source 2 | |
Funding Source 3 | |
Funding Source 4 | |
Stage 2 Submittal PDF | |
Stage 3 Submittal PDF | |
Stage 4 Submittal PDF | |
Funding Source 1 Amount | |
Funding Source 2 Amount | |
Funding Source 3 Amount | |
Funding Source 4 Amount | |
Renderings | |
Zone | 5 |
Street Address | 650 University Boulevard East, Tuscaloosa, AL 35401 |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
College/Division | College of Nursing |
Project Admin | Haley Johnson |
Field Coordinator | Shane Peacock |
Construction Start | January 2020 |
Scheduled Construction End | 12/01/2020 |
COSC Date | |
Year End Inspection | |
View Warranty Documents | https://uafinancialaffairs.sharepoint.com/sites/7M27T/680-15-363/ |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90817 |
Interior Designer | Laura Nichols (8-7269) |
Parking Spaces | |
Construction Photos Link | |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Attachment I | |
CSP I PDF | |
CSP II PDF | |
BOT Info Item PDF | |
Stage 1 Package Fields | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
Funding Source(s) | |
Fundraising Site | https://giving.ua.edu/nursing/ |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bid/bid-opening-capstone-college-of-nursing-addition-010-18-1591/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code |