Delta Gamma Renovations and Addition

  • 325 Judy Bonner Drive
Information at a Glance

Use

Greek

Status

Active

Construction Type

Addition

Current Phase

Complete

College or Division

Division of Student Life

CA Filing Code

831-19-2164

Project GSF

1,378

Bid Date

August 5, 2021

Construction Start

November 22, 2021

Construction End

September 16, 2022

COSC Date

' October 24, 2022

Project Architect

Ellis Architects

General Contractor

J.T. Harrison Construction Co., Inc.

Project Manager

Suzanne Webster (8-6907)

Field Coordinator

Colby Mixon

Project Admin

Alison Langham

Project Summary

This project will be completed in two packages: Package 1 – Included the renovation of the 1,143 sq. ft. serving line area and the 2,000 sq. ft. dining area and was completed in the summer 2020. Package 2 – Addition will include the construction of a 978 sq. ft. addition to the building (326 gsf for the first, second and third floors).

 

View Progress Photos!

 

 


Information at a Glance

BOT Budget

$2,000,000.00

Funding Sources

  • Chapter Reserves :
    $2,000,000

Banner/Project #

98455

Project Accountant

Demon Patrick

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

  • See Stage I

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Greek
College/Division Division of Student Life
Status Active
Construction Phase Complete
Construction Type Addition
GSF 1,378
Street Address 325 Judy Bonner Drive
Zone
Project Number 831-19-2164
Architect Ellis Architects
Project Manager Suzanne Webster (8-6907)
Project Admin Alison Langham
Field Coordinator Colby Mixon
General Contractor J.T. Harrison Construction Co., Inc.
Interior Designer
Bid Date August 5, 2021
Construction Start November 22, 2021
Scheduled Construction End September 16, 2022
COSC Date October 24, 2022
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/831-19-2164
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98455
Campus Map Link https://map.concept3d.com/?id=1222#!m/576386?ce/31890?ct/40824,31490?mc/33.2116864698756,-87.5445342063904?z/17?lvl/0
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/Zone7/buildings/831/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

This project will be completed in two packages: Package 1 – Included the renovation of the 1,143 sq. ft. serving line area and the 2,000 sq. ft. dining area and was completed in the summer 2020. Package 2 – Addition will include the construction of a 978 sq. ft. addition to the building (326 gsf for the first, second and third floors).

 

View Progress Photos!

 

 

Renderings
Budget 2000000
Banner Fund Number 98455
Project Accountant Demon Patrick
Funding Source(s)
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=98455&detail=all
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=A6C83B7F-39B0-4436-962F-D9D360FE84FC
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage