University Hall Renovation

  • Peter Bryce Campus
Information at a Glance

Use

Academic

Status

Closed

Construction Type

Renovation

Current Phase

Complete

College or Division

College of Continuing Studies

CA Filing Code

420-17-1006

Project GSF

75,973

Bid Date

December 7, 2017

Construction Start

February 2018

Construction End

August 2019

COSC Date

' July 19, 2019

Project Architect

Williams Blackstock

General Contractor

Bailey Harris

Project Manager

Ben Youngblood (8-7574)

Field Coordinator

Ed Sawyer (8-1684)

Interior Designer

Michael Hand (8-8456)

Project Admin

TBD

Project Summary

With the completion of this project, University Hall is now the new home of the College of Continuing Studies programs. The first floor supports New College LIfe Track, Instructional Technology and Academic Services, and Safe State and Information Technology. The second floor will house Early College, and the third floor will support the Dean’s Office along with support operations.

The scope of this project included the stabilization of the building envelope and interior renovations. The existing building is a masonry and concrete structure over a crawlspace — constructed around 1938.


Information at a Glance

BOT Budget

$25,923,159.00

Funding Sources

  • General Revenue Bonds :
    $25,923,159

Banner/Project #

94963

Project Accountant

Cindy Fowler (8-5460)

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

  • 2013-14 ACDP, JUNE 2013

Stage 2

Stage 3

  • NOT REQUIRED

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division College of Continuing Studies
Status Closed
Construction Phase Complete
Construction Type Renovation
GSF 75,973
Street Address Peter Bryce Campus
Zone
Project Number 420-17-1006
Architect Williams Blackstock
Project Manager Ben Youngblood (8-7574)
Project Admin TBD
Field Coordinator Ed Sawyer (8-1684)
General Contractor Bailey Harris
Interior Designer Michael Hand (8-8456)
Bid Date December 7, 2017
Construction Start February 2018
Scheduled Construction End August 2019
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/7M27T/420-17-1006/default.aspx
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=94963
Campus Map Link https://map.concept3d.com/?id=1222#!m/439566
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/Zone3/buildings/Bryce%20Campus/420/default.aspx
Construction Photos Link
Project Summary

With the completion of this project, University Hall is now the new home of the College of Continuing Studies programs. The first floor supports New College LIfe Track, Instructional Technology and Academic Services, and Safe State and Information Technology. The second floor will house Early College, and the third floor will support the Dean’s Office along with support operations.

The scope of this project included the stabilization of the building envelope and interior renovations. The existing building is a masonry and concrete structure over a crawlspace — constructed around 1938.

Renderings
Budget 25923159
Banner Fund Number 94963
Project Accountant Cindy Fowler (8-5460)
Funding Source(s)
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=75F8DAD2-2D26-420F-A5A6-9F1AD9550F97
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=94963&detail=all
View Bid Tab https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/University-Hall-Renovation-420-17-1006B-12-7-17.pdf
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
COSC Date July 19, 2019
Year End Inspection
View Warranty Documents
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
Advertisement for Bids
Closeout Documents Link
RFQ Documents
Bid Tabulations
360 Embed Code