Student Health and Wellness Building
- East Bryce Campus, South of Kilgore Lane
Use
Other
Status
Construction Type
New Construction
Current Phase
Programming
College or Division
Division of Student Life
CA Filing Code
410-24-3631
Project GSF
90,385
Bid Date
TBD
Construction Start
TBD
Construction End
TBD
COSC Date
' TBD
Project Architect
Williams Blackstock Architects
General Contractor
TBD
Project Manager
Steven Mercado
Field Coordinator
TBD
Interior Designer
TBD
Project Admin
Katie Crocker-Buta
The Student Health and Wellness Building New Construction Project is proposed as a one-story building with a basement. The ground floor will be approximately 54,765 gross square feet that will serve as offices for multiple divisions of UA Student Life including the Counseling Center, Collegiate Recovery and Intervention Services, Health Promotion and Wellness, and the Women and Gender Resource Center. The construction of a new building dedicated to Student Wellness and Wellbeing promotes the importance of serving students holistically while on campus.
A lower level will include approximately 35,620 gsf and is proposed to house a district storm shelter with the capacity for 1,500 people to support master planned residential facilities in the area. A single storm shelter for the area is more economical as it would eliminate the need for parallel and redundant emergency generators and support infrastructure at individual facilities. It is also more economical to construct the storm shelter in a one-story facility than embedded within a high rise due to stringent structural considerations.
A district thermal energy plant that will also provide chilled water for the Student Health and Wellness Building, University Hall and future facilities in the surrounding area. Mechanical space from the main floor will potentially be relocated to the lower level to better serve the facility. Given the close proximity of existing and planned facilities and the energy demand density, a district plant with water cooled chillers is much more economical than individual cooling infrastructure at each facility.
Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges. The long lead items the project intends to purchase will be electrical equipment, a generator, chillers and cooling towers.
BOT Budget
$64,000,000.00
Funding Sources
-
Future Revenue Bonds :
$44,000,000 -
University Central Reserves :
$4,000,000
Banner/Project #
91258
Project Accountant
Kimberly Lee
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Other |
College/Division | Division of Student Life |
Status | Active |
Construction Phase | Programming |
Construction Type | New Construction |
GSF | 90,385 |
Street Address | East Bryce Campus, South of Kilgore Lane |
Zone | |
Project Number | 410-24-3631 |
Architect | Williams Blackstock Architects |
Project Manager | Steven Mercado |
Project Admin | Katie Crocker-Buta |
Field Coordinator | TBD |
General Contractor | TBD |
Interior Designer | TBD |
Bid Date | TBD |
Construction Start | TBD |
Scheduled Construction End | TBD |
COSC Date | TBD |
Year End Inspection | TBD |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/410-24-3631 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91258 |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Student Health and Wellness Building New Construction Project is proposed as a one-story building with a basement. The ground floor will be approximately 54,765 gross square feet that will serve as offices for multiple divisions of UA Student Life including the Counseling Center, Collegiate Recovery and Intervention Services, Health Promotion and Wellness, and the Women and Gender Resource Center. The construction of a new building dedicated to Student Wellness and Wellbeing promotes the importance of serving students holistically while on campus. A lower level will include approximately 35,620 gsf and is proposed to house a district storm shelter with the capacity for 1,500 people to support master planned residential facilities in the area. A single storm shelter for the area is more economical as it would eliminate the need for parallel and redundant emergency generators and support infrastructure at individual facilities. It is also more economical to construct the storm shelter in a one-story facility than embedded within a high rise due to stringent structural considerations. A district thermal energy plant that will also provide chilled water for the Student Health and Wellness Building, University Hall and future facilities in the surrounding area. Mechanical space from the main floor will potentially be relocated to the lower level to better serve the facility. Given the close proximity of existing and planned facilities and the energy demand density, a district plant with water cooled chillers is much more economical than individual cooling infrastructure at each facility. Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges. The long lead items the project intends to purchase will be electrical equipment, a generator, chillers and cooling towers. |
Renderings | |
Budget | 64000000 |
Banner Fund Number | 91258 |
Project Accountant | Kimberly Lee |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |