Student Well-Being Hub

  • 259 Kilgore Lane
Information at a Glance

Use

Other

Status

Active

Construction Type

New Construction

Current Phase

Bid

College or Division

Division of Student Life

CA Filing Code

410-24-3631

Project GSF

82,485

Bid Date

Early Site Package: December 17, 2024

Project Architect

Williams Blackstock Architects

Project Manager

Steven Mercado

Project Admin

Katie Crocker-Buta

Project Summary

The University of Alabama’s Student Well-Being Hub New Construction Project (“Project”) is proposed as a one-story building with a walkout basement for mechanical and service support space. The main level will be approximately 57,809 gross square feet (“gsf”) and will serve as offices for multiple divisions of Student Life including the Counseling Center, Collegiate Recovery and Intervention Services, Health Promotion and Wellness, and the Women and Gender Resource Center. The construction of a new building dedicated to Student Wellness and Wellbeing promotes the importance of serving students holistically while on campus.

As Housing and Residential Communities has elected to defer consideration of adjacent residence halls, The University recommends removing the storm shelter from the project scope since there are two storm shelters close to the building site. Accordingly, revisions were necessary to reduce the size of the building from 90,385 gsf to 82,485 gsf. The revisions include removing the storm shelter, reducing the size of the generator, HVAC requirements, the east side drive ramp, and the east side ADA ramp to the storm shelter.

A district thermal energy plant will provide chilled water for the Student Well-Being Hub, University Hall and future facilities in the surrounding area. Mechanical space from the main floor will potentially be relocated to the lower level to better serve the facility. Given the close proximity of existing and planned facilities and the energy demand density, a district plant with Page 93 of 426 water cooled chillers is much more economical than individual cooling infrastructure at each facility.

The Kilgore Lane Sidewalk Connectivity package will provide safe pedestrian passage on the north side of the site. The new sidewalk will be for a pedestrian path to Peter Bryce Blvd from the central Bryce campus, which will include lighting and landscaping. This will be completed as an early package so to maintain pedestrian connectivity in the area during construction of the Project.

Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges. The long lead items the project intends to purchase will be electrical equipment, a generator, chillers and cooling towers.


Information at a Glance

BOT Budget

$59,936,000.00

Funding Sources

  • General Revenue Bonds Series 2024-B :
    $44,000,000
  • University Central Reserves :
    $15,936,000

Banner/Project #

91258

Project Accountant

Kimberly Lee

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Other
College/Division Division of Student Life
Status Active
Construction Phase Bid
Construction Type New Construction
GSF 82,485
Street Address 259 Kilgore Lane
Zone
Project Number 410-24-3631
Architect Williams Blackstock Architects
Project Manager Steven Mercado
Project Admin Katie Crocker-Buta
Field Coordinator
General Contractor
Interior Designer
Bid Date Early Site Package: December 17, 2024
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/410-24-3631
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91258
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The University of Alabama’s Student Well-Being Hub New Construction Project (“Project”) is proposed as a one-story building with a walkout basement for mechanical and service support space. The main level will be approximately 57,809 gross square feet (“gsf”) and will serve as offices for multiple divisions of Student Life including the Counseling Center, Collegiate Recovery and Intervention Services, Health Promotion and Wellness, and the Women and Gender Resource Center. The construction of a new building dedicated to Student Wellness and Wellbeing promotes the importance of serving students holistically while on campus.

As Housing and Residential Communities has elected to defer consideration of adjacent residence halls, The University recommends removing the storm shelter from the project scope since there are two storm shelters close to the building site. Accordingly, revisions were necessary to reduce the size of the building from 90,385 gsf to 82,485 gsf. The revisions include removing the storm shelter, reducing the size of the generator, HVAC requirements, the east side drive ramp, and the east side ADA ramp to the storm shelter.

A district thermal energy plant will provide chilled water for the Student Well-Being Hub, University Hall and future facilities in the surrounding area. Mechanical space from the main floor will potentially be relocated to the lower level to better serve the facility. Given the close proximity of existing and planned facilities and the energy demand density, a district plant with Page 93 of 426 water cooled chillers is much more economical than individual cooling infrastructure at each facility.

The Kilgore Lane Sidewalk Connectivity package will provide safe pedestrian passage on the north side of the site. The new sidewalk will be for a pedestrian path to Peter Bryce Blvd from the central Bryce campus, which will include lighting and landscaping. This will be completed as an early package so to maintain pedestrian connectivity in the area during construction of the Project.

Long lead items will be Owner Purchased Contractor Installed to mitigate the effect of continued supply chain challenges. The long lead items the project intends to purchase will be electrical equipment, a generator, chillers and cooling towers.

Renderings
Budget 59936000
Banner Fund Number 91258
Project Accountant Kimberly Lee
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code