Sigma Kappa Sorority House

  • 890 Judy Bonner Drive
Information at a Glance

Use

Greek

Status

Active

Construction Type

New Construction

Current Phase

Design

College or Division

Division of Student Life

CA Filing Code

142-22-2985

Project GSF

40,000

Bid Date

TBD

COSC Date

TBD

Project Architect

Christopher Architecture and Interiors

General Contractor

TBD

Project Manager

Michael Hand

Field Coordinator

Colby Mixon

Project Admin

Alison Langham

Project Summary

The addition of new Sigma Kappa chapter house will be located at the northeast corner of Colonial Drive and Judy Bonner Drive. The new facility will sit in the current location of Harris Hall and the demolished former Alpha Gamma Delta house. It will be three-story house and a basement, main level to accommodate dining and meetings for the Chapter and two floors for member sleeping rooms totaling 40,000 square feet.


Information at a Glance

BOT Budget

$21,000,000.00

Funding Sources

  • Chapter Reserve:
    $2,000,000
  • Chapter Payables:
    $19,000,000
BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Greek
College/Division Division of Student Life
Status Active
Construction Phase Design
Construction Type New Construction
GSF 40,000
Street Address 890 Judy Bonner Drive
Zone
Project Number 142-22-2985
Architect Christopher Architecture and Interiors
Project Manager Michael Hand
Project Admin Alison Langham
Field Coordinator Colby Mixon
General Contractor TBD
Interior Designer
Bid Date TBD
Construction Start
Scheduled Construction End
COSC Date TBD
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX
Campus Map Link https://map.concept3d.com/?id=1222#!m/637082
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The addition of new Sigma Kappa chapter house will be located at the northeast corner of Colonial Drive and Judy Bonner Drive. The new facility will sit in the current location of Harris Hall and the demolished former Alpha Gamma Delta house. It will be three-story house and a basement, main level to accommodate dining and meetings for the Chapter and two floors for member sleeping rooms totaling 40,000 square feet.

Renderings
Budget 21000000
Banner Fund Number
Project Accountant
Funding Source(s) Array
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s) Array
Stage 2 BOT Submittal(s) Array
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code