Sigma Kappa Sorority House New Construction
- 890 Judy Bonner Drive
Use
Greek
Status
Construction Type
New Construction
Current Phase
Design
College or Division
Division of Student Life
CA Filing Code
142-22-2985
Project GSF
40,000
Bid Date
September 2023
Project Architect
Christopher Architecture and Interiors
Project Manager
Michael Hand
Field Coordinator
Colby Mixon
Project Admin
Alison Langham
The addition of new Sigma Kappa chapter house will be located at the northeast corner of Colonial Drive and Judy Bonner Drive. The new facility will sit in the current location of Harris Hall and the demolished former Alpha Gamma Delta house. It will be three-story house and a basement, main level to accommodate dining and meetings for the Chapter and two floors for member sleeping rooms totaling 40,000 square feet.
BOT Budget
$21,000,000.00
Funding Sources
-
Chapter Reserve:
$2,000,000 -
Chapter Payables:
$19,000,000
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Greek |
College/Division | Division of Student Life |
Status | Active |
Construction Phase | Design |
Construction Type | New Construction |
GSF | 40,000 |
Street Address | 890 Judy Bonner Drive |
Zone | |
Project Number | 142-22-2985 |
Architect | Christopher Architecture and Interiors |
Project Manager | Michael Hand |
Project Admin | Alison Langham |
Field Coordinator | Colby Mixon |
General Contractor | |
Interior Designer | |
Bid Date | September 2023 |
Construction Start | |
Scheduled Construction End | |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/142-22-2985 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90986 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/637082 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary | The addition of new Sigma Kappa chapter house will be located at the northeast corner of Colonial Drive and Judy Bonner Drive. The new facility will sit in the current location of Harris Hall and the demolished former Alpha Gamma Delta house. It will be three-story house and a basement, main level to accommodate dining and meetings for the Chapter and two floors for member sleeping rooms totaling 40,000 square feet. |
Renderings | Array |
Budget | 21000000 |
Banner Fund Number | |
Project Accountant | |
Funding Source(s) | Array |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | Array |
Stage 2 BOT Submittal(s) | Array |
Stage 3 BOT Submittal(s) | Array |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | Array |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage | Array |