Russell Hall Nutrition and Microbiome Lab and Research Support

  • 504 University Boulevard, Tuscaloosa, Alabama 35487
Information at a Glance

Use

Research

Status

Closed

Construction Type

Renovation

Current Phase

Complete

College or Division

College of Human and Environmental Sciences

CA Filing Code

226-18-1454

Project GSF

1,276

Bid Date

July 30, 2019

COSC Date

' May 15, 2020

Project Architect

Turner Batson Architects

General Contractor

Kyser Construction

Project Manager

Danny Collins (8-8159)

Field Coordinator

TBD

Interior Designer

TBD

Project Admin

Laurie Pitts (8-5950)

Project Summary

This project encompasses the renovation of approximately 1,276 sf of existing space on the first floor of Russell Hall.

Package A – Nutrition and Microbiome Laboratory has been designed and bid and is currently being constructed.

Package B – Research Support Fitout will entail the renovation of 6,696 sf of space located west of the first-floor entry lobby to provide offices, an interview room, conference room, kitchenette and copy room. The space will be brought up to current code and the technology infrastructure will be upgraded. This is the last section of Russell Hall to be renovated beginning with the 2011 Renovation and Addition project and will complete the building.


Information at a Glance

BOT Budget

$3,106,000.00

Funding Sources

  • Office of Academic Affairs Reserves :
    $2,216,000
  • Research and Economic Development Reserves :
    $640,000
  • College of Human Environmental Sciences Reserves :
    $250,000

Banner/Project #

90857

Project Accountant

Demon Patrick (8-8714)

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

  • SEE STAGE 1

Stage 3

  • NOT REQUIRED

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Research
College/Division College of Human and Environmental Sciences
Status Closed
Construction Phase Complete
Construction Type Renovation
GSF 1,276
Street Address 504 University Boulevard, Tuscaloosa, Alabama 35487
Zone
Project Number 226-18-1454
Architect Turner Batson Architects
Project Manager Danny Collins (8-8159)
Project Admin Laurie Pitts (8-5950)
Field Coordinator TBD
General Contractor Kyser Construction
Interior Designer TBD
Bid Date July 30, 2019
Construction Start
Scheduled Construction End
Fundraising Site
SharePoint Active Project Site Link https://uafinancialaffairs.sharepoint.com/sites/9VD1V/226-18-1454/
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90857
Campus Map Link
BIR Building Link https://uafinancialaffairs.sharepoint.com/sites/98C3D/Zone1/buildings/226/
Construction Photos Link
Project Summary

This project encompasses the renovation of approximately 1,276 sf of existing space on the first floor of Russell Hall.

Package A – Nutrition and Microbiome Laboratory has been designed and bid and is currently being constructed.

Package B – Research Support Fitout will entail the renovation of 6,696 sf of space located west of the first-floor entry lobby to provide offices, an interview room, conference room, kitchenette and copy room. The space will be brought up to current code and the technology infrastructure will be upgraded. This is the last section of Russell Hall to be renovated beginning with the 2011 Renovation and Addition project and will complete the building.

Renderings
Budget 3106000
Banner Fund Number 90857
Project Accountant Demon Patrick (8-8714)
Funding Source(s)
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=ED8F3AC0-564A-4A06-A505-04C375AE353A
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=90857&detail=all
View Bid Tab https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Russell-Hall-1st-Floor-Nutrition-Lab-226-18-1454.pdf
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
COSC Date May 15, 2020
Year End Inspection Information Not Yet Available
View Warranty Documents
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Link to Bid Site https://constructionpublicinfo.ua.edu/bid/bid-opening-russell-hall-research-support-fitout-226-18-1454b/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
Advertisement for Bids
Closeout Documents Link
RFQ Documents
Bid Tabulations
360 Embed Code