Russell Hall Nutrition and Microbiome Lab and Research Support
- 504 University Boulevard, Tuscaloosa, Alabama 35487
Use
Research
Status
Construction Type
Renovation
Current Phase
Complete
College or Division
College of Human and Environmental Sciences
CA Filing Code
226-18-1454
Project GSF
1,276
Bid Date
July 30, 2019
COSC Date
' May 15, 2020
Project Architect
Turner Batson Architects
General Contractor
Kyser Construction
Project Manager
Danny Collins (8-8159)
Field Coordinator
TBD
Interior Designer
TBD
Project Admin
Laurie Pitts (8-5950)
This project encompasses the renovation of approximately 1,276 sf of existing space on the first floor of Russell Hall.
Package A – Nutrition and Microbiome Laboratory has been designed and bid and is currently being constructed.
Package B – Research Support Fitout will entail the renovation of 6,696 sf of space located west of the first-floor entry lobby to provide offices, an interview room, conference room, kitchenette and copy room. The space will be brought up to current code and the technology infrastructure will be upgraded. This is the last section of Russell Hall to be renovated beginning with the 2011 Renovation and Addition project and will complete the building.
BOT Budget
$3,106,000.00
Funding Sources
-
Office of Academic Affairs Reserves :
$2,216,000 -
Research and Economic Development Reserves :
$640,000 -
College of Human Environmental Sciences Reserves :
$250,000
Banner/Project #
90857
Project Accountant
Demon Patrick (8-8714)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Research |
College/Division | College of Human and Environmental Sciences |
Status | Closed |
Construction Phase | Complete |
Construction Type | Renovation |
GSF | 1,276 |
Street Address | 504 University Boulevard, Tuscaloosa, Alabama 35487 |
Zone | |
Project Number | 226-18-1454 |
Architect | Turner Batson Architects |
Project Manager | Danny Collins (8-8159) |
Project Admin | Laurie Pitts (8-5950) |
Field Coordinator | TBD |
General Contractor | Kyser Construction |
Interior Designer | TBD |
Bid Date | July 30, 2019 |
Construction Start | |
Scheduled Construction End | |
Fundraising Site | |
SharePoint Active Project Site Link | https://uafinancialaffairs.sharepoint.com/sites/9VD1V/226-18-1454/ |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90857 |
Campus Map Link | |
BIR Building Link | https://uafinancialaffairs.sharepoint.com/sites/98C3D/Zone1/buildings/226/ |
Construction Photos Link | |
Project Summary |
This project encompasses the renovation of approximately 1,276 sf of existing space on the first floor of Russell Hall. Package A – Nutrition and Microbiome Laboratory has been designed and bid and is currently being constructed. Package B – Research Support Fitout will entail the renovation of 6,696 sf of space located west of the first-floor entry lobby to provide offices, an interview room, conference room, kitchenette and copy room. The space will be brought up to current code and the technology infrastructure will be upgraded. This is the last section of Russell Hall to be renovated beginning with the 2011 Renovation and Addition project and will complete the building. |
Renderings | |
Budget | 3106000 |
Banner Fund Number | 90857 |
Project Accountant | Demon Patrick (8-8714) |
Funding Source(s) | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=ED8F3AC0-564A-4A06-A505-04C375AE353A |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90857&detail=all |
View Bid Tab | https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Russell-Hall-1st-Floor-Nutrition-Lab-226-18-1454.pdf |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
COSC Date | May 15, 2020 |
Year End Inspection | Information Not Yet Available |
View Warranty Documents | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bid/bid-opening-russell-hall-research-support-fitout-226-18-1454b/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code |