Presidents Hall Commemorative Wall

Information at a Glance

Use

Other

Status

Active

Construction Type

New Construction

Current Phase

Complete

College or Division

Other

CA Filing Code

LAN-21-2731

Construction Start

December 2021

Construction End

February 2022

COSC Date

' TBD

Project Architect

UA Senior Landscape Architect

Project Manager

Steven Mercado

Field Coordinator

Joe Daidone

Project Admin

Cassidy Largin

Project Summary

The Presidents Hall Commemorative Wall is to be located at the southwest corner of Presidents Hall (previously Manly Hall) at the northeast intersection of McCorvey Drive and Capstone Drive. The project will provide a space to celebrate past presidents of the University, as well as provide a gathering and seating space for students and visitors. The approximately 23’ clear inside diameter space will include an inlaid seven (7’) granite medallion identifying the space with the University seal, brick walls to match the adjacent building, granite blocks with bronze plaques for the President’s names, integral limestone seating, and University standard pavers. The materials and design will intentionally blend and complement campus and adjacent architecture.

 

View Progress Photos!
Information at a Glance

BOT Budget

$247,000.00

Funding Sources

  • University Central Reserves :
    $247,000

Banner/Project #

90950

Project Accountant

Demon Patrick

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Other
College/Division Other
Status Active
Construction Phase Complete
Construction Type New Construction
GSF
Street Address
Zone 1
Project Number LAN-21-2731
Architect UA Senior Landscape Architect
Project Manager Steven Mercado
Project Admin Cassidy Largin
Field Coordinator Joe Daidone
General Contractor
Interior Designer
Bid Date
Construction Start December 2021
Scheduled Construction End February 2022
COSC Date TBD
Year End Inspection Information Not Yet Available
Fundraising Site
SharePoint Active Project Site Link
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90950
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Presidents Hall Commemorative Wall is to be located at the southwest corner of Presidents Hall (previously Manly Hall) at the northeast intersection of McCorvey Drive and Capstone Drive. The project will provide a space to celebrate past presidents of the University, as well as provide a gathering and seating space for students and visitors. The approximately 23’ clear inside diameter space will include an inlaid seven (7’) granite medallion identifying the space with the University seal, brick walls to match the adjacent building, granite blocks with bronze plaques for the President’s names, integral limestone seating, and University standard pavers. The materials and design will intentionally blend and complement campus and adjacent architecture.

 

View Progress Photos!
Renderings
Budget 247000
Banner Fund Number 90950
Project Accountant Demon Patrick
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage