Moody Music Building Restoration
- 810 2nd Avenue, Tuscaloosa, Alabama 35487
Information at a Glance
Use
Academic
Status
Construction Type
Renovation
Current Phase
Complete
College or Division
College of Arts and Sciences
CA Filing Code
118-20-2406
Project GSF
32,914
Bid Date
June 25, 2020 2PM
Construction Start
April 2020
Construction End
February 28, 2021
COSC Date
' January 8, 2021
Project Architect
Turner Batson Architects
General Contractor
WAR Construction
Project Manager
Paul Davis
Field Coordinator
David Hazzard
Project Admin
Madison Poole
Information at a Glance
BOT Budget
$9,200,000.00
Funding Sources
-
University Reserves and Gifts :
$400,000 -
Estimated State Insurance Funds :
$8,800,000
Banner/Project #
98555
BOT Submissions
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
Request for Qualifications
Bid Information
Bid Package | Important Dates | Bid Documents | |
---|---|---|---|
Moody Music Building Restoration | Prequalifications Due:
June 2, 2020 5:00 pm Mandatory Pre-bid Conference: June 9, 2020 2:00 pm Mandatory Pre-bid Conference Location: Procurement Services Annex Bid Opening: June 25, 2020 2:00 pm Bid Opening Location: TBD |
||
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
College/Division | College of Arts and Sciences |
Status | Active |
Construction Phase | Complete |
Construction Type | Renovation |
GSF | 32,914 |
Street Address | 810 2nd Avenue, Tuscaloosa, Alabama 35487 |
Zone | 6 |
Project Number | 118-20-2406 |
Architect | Turner Batson Architects |
Project Manager | Paul Davis |
Project Admin | Madison Poole |
Field Coordinator | David Hazzard |
General Contractor | WAR Construction |
Interior Designer | |
Bid Date | June 25, 2020 2PM |
Construction Start | April 2020 |
Scheduled Construction End | February 28, 2021 |
COSC Date | January 8, 2021 |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/118-20-2406/SitePages/Home.aspx |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=98555 |
Campus Map Link | |
BIR Building Link | https://uafinancialaffairs.sharepoint.com/sites/98C3D/Zone6/buildings/118 |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary | |
Renderings | |
Budget | 9200000 |
Banner Fund Number | 98555 |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=98555&detail=all |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=8CBB77CB-74D3-4842-B613-D10599FE534F |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code |