Harris Hall and the Former Alpha Gamma Delta House Demolition
- 745 Colonial Drive and 890 Judy Bonner Drive
CA Filing Code
004-22-2766
Project GSF
- 68,463
Bid Date
Multiple
Construction End
July 2023
Project Architect
Davis Architects
General Contractor
Britt Demolition
Project Manager
Suzanne Webster
Field Coordinator
Colby Mixon
Project Admin
Alison Langham
The University of Alabama (“University”) proposes to demolish Harris Hall and the Former Alpha Gamma Delta House buildings (“Project”) located at 745 Colonial Drive and 890 Judy Bonner Drive respectively in accordance with the Campus Master Plan Amendment approved by The Board of Trustees of The University of Alabama on September 17, 2021.
Originally constructed in 1939, Harris Hall consists of a three (3) story structure and is approximately 49,940 gross square feet in total. The estimated deferred maintenance liability for the buildings is approximately $5,266,277, not including code required upgrades for ADA. The demolition will result in annual savings of approximately $221,481 in Operations and Maintenance
costs.
The former Alpha Gamma Delta House, originally constructed in 1960, consists of a three (3) story structure and full basement and is approximately 18,523 gross square feet in total. The estimated deferred maintenance liability for the buildings is approximately $987,000 not including code required upgrades for ADA. The demolition will result in annual savings of approximately $28,807 in Operations and Maintenance costs.
In accordance with standard University procedure for main campus building demolition, The University will complete the Historic American Building Survey (HABS) and Historic American Building Engineering Record (HAER), and a standard building commemoration pedestal and plaque will be provided for the site.
View Progress Photos!
BOT Budget
$955,000
Funding Sources
-
University Central Reserves :
$955,000
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
January 27, 2022
Former Alpha Gamma Delta House Demolition -
March 10, 2022
Harris Hall Demolition
DATA LABEL | DATA VALUE |
---|---|
Category | Other |
College/Division | Other |
Status | Active |
Construction Phase | Complete |
Construction Type | Other |
GSF | - 68,463 |
Street Address | 745 Colonial Drive and 890 Judy Bonner Drive |
Zone | 7 |
Project Number | 004-22-2766 |
Architect | Davis Architects |
Project Manager | Suzanne Webster |
Project Admin | Alison Langham |
Field Coordinator | Colby Mixon |
General Contractor | Britt Demolition |
Interior Designer | |
Bid Date | Multiple |
Construction Start | |
Scheduled Construction End | July 2023 |
COSC Date | |
Year End Inspection | Information Not Yet Available |
Fundraising Site | |
SharePoint Active Project Site Link | |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/584095 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The University of Alabama (“University”) proposes to demolish Harris Hall and the Former Alpha Gamma Delta House buildings (“Project”) located at 745 Colonial Drive and 890 Judy Bonner Drive respectively in accordance with the Campus Master Plan Amendment approved by The Board of Trustees of The University of Alabama on September 17, 2021. Originally constructed in 1939, Harris Hall consists of a three (3) story structure and is approximately 49,940 gross square feet in total. The estimated deferred maintenance liability for the buildings is approximately $5,266,277, not including code required upgrades for ADA. The demolition will result in annual savings of approximately $221,481 in Operations and Maintenance The former Alpha Gamma Delta House, originally constructed in 1960, consists of a three (3) story structure and full basement and is approximately 18,523 gross square feet in total. The estimated deferred maintenance liability for the buildings is approximately $987,000 not including code required upgrades for ADA. The demolition will result in annual savings of approximately $28,807 in Operations and Maintenance costs. In accordance with standard University procedure for main campus building demolition, The University will complete the Historic American Building Survey (HABS) and Historic American Building Engineering Record (HAER), and a standard building commemoration pedestal and plaque will be provided for the site. View Progress Photos!
|
Renderings | |
Budget | 955000 |
Banner Fund Number | |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=649A1F64-92F1-4A83-A67B-11494185DE31 |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |