H.M. Comer Hall Interior Renovations

  • 245 7th Avenue
Information at a Glance

Use

Academic

Status

Active

Construction Type

Renovation

Current Phase

Bid

College or Division

College of Engineering

CA Filing Code

245-24-3576

Project GSF

12,911

Bid Date

June 13, 2024

Project Architect

KPS Group Architects

General Contractor

Snow-Blakeney Construction, Inc.

Project Manager

Brittany Kyles

Project Admin

Haley Tubbs

Project Summary

The project consists of reutilizing space in the first and second floor of HM Comer to give engineering students, Aerospace Engineering and Mechanics (AEM) and Civil, Construction and Environmental Engineering (CCEE) departments separate areas for operation.

The renovation will include the “CUBE” area on the first floor and select offices on the East and West wings of the second floor, with new spaces being rebuilt to suit each respective department’s needs.

First floor modifications will give students a secure area, accessible at all hours, where they can collaborate with other students, helping them to excel in their studies and gain even more value from their time at the University.

Currently, the AEM and CCEE departments are dissimilar in functions, but are housed with each other. Having their own areas on the second floor will allow them to operate more efficiently and effectively for their students’ needs, allowing for more advancement to the College of Engineering as a whole.

In addition, the 3rd Floor is now proposed to be renovated, following the completion of the 2nd floor scope and resulting 3rd Floor vacancies, and will address the need for increased operational efficiencies and effectiveness amongst the College of Engineering’s Financial Services, External Affairs, and Dean’s Office Administrators.

The planning for this additional work was originally included in the Project and with the realized bid savings from the Package A bid the College would like to move forward with the work.


Information at a Glance

BOT Budget

$2,600,000

Funding Sources

  • Office of Academic Affairs Reserves :
    $1,850,000
  • College of Engineering Reserves :
    $750,000

Banner/Project #

91257

Project Accountant

Sonia Wilkins

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division College of Engineering
Status Active
Construction Phase Bid
Construction Type Renovation
GSF 12,911
Street Address 245 7th Avenue
Zone
Project Number 245-24-3576
Architect KPS Group Architects
Project Manager Brittany Kyles
Project Admin Haley Tubbs
Field Coordinator
General Contractor Snow-Blakeney Construction, Inc.
Interior Designer
Bid Date June 13, 2024
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91257
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The project consists of reutilizing space in the first and second floor of HM Comer to give engineering students, Aerospace Engineering and Mechanics (AEM) and Civil, Construction and Environmental Engineering (CCEE) departments separate areas for operation.

The renovation will include the “CUBE” area on the first floor and select offices on the East and West wings of the second floor, with new spaces being rebuilt to suit each respective department’s needs.

First floor modifications will give students a secure area, accessible at all hours, where they can collaborate with other students, helping them to excel in their studies and gain even more value from their time at the University.

Currently, the AEM and CCEE departments are dissimilar in functions, but are housed with each other. Having their own areas on the second floor will allow them to operate more efficiently and effectively for their students’ needs, allowing for more advancement to the College of Engineering as a whole.

In addition, the 3rd Floor is now proposed to be renovated, following the completion of the 2nd floor scope and resulting 3rd Floor vacancies, and will address the need for increased operational efficiencies and effectiveness amongst the College of Engineering’s Financial Services, External Affairs, and Dean’s Office Administrators.

The planning for this additional work was originally included in the Project and with the realized bid savings from the Package A bid the College would like to move forward with the work.

Renderings
Budget 2600000
Banner Fund Number 91257
Project Accountant Sonia Wilkins
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage