Gorgas Library Core Support, Phase II
- 711 Capstone Drive
Use
Academic
Status
Construction Type
Renovation
Current Phase
Construction
College or Division
University Libraries
CA Filing Code
013-21-2678
Project GSF
11,800
Bid Date
July 26, 2022
Construction Start
March 2023
Construction End
May 2024
COSC Date
' TBD
Project Architect
CMH Architects
General Contractor
J.T. Harrison Construction Co., Inc.
Project Manager
Mary Kathryn Holt
Field Coordinator
Chuck Hinton
Project Admin
Katie Crocker-Buta
The proposed Gorgas Library Core Support, Phase II project (“Project”) is a critical step in the realignment of library space in order to meet the strategic plan of The University of Alabama and to transform University libraries as necessary to support the academic mission and the teaching, research and learning environment. The Project will address deferred maintenance needs and install core infrastructure to support future development in coordination with the Gorgas Library Master Plan.
The interior scope includes new mechanical and fire pump rooms to house the new campus central thermal connection interface for hot and chilled water and fire water service. A new electrical room will provide a service feed to the new main switchboard in the building. A stairwell conversion will provide area inside the building for the new data, electrical and mechanical rooms and mechanical chase.
BOT Budget
$15,773,338
Funding Sources
-
University Central Reserves :
$13,738,310
Banner/Project #
90957
Project Accountant
Sonia Wilkins
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
April 26, 2022
Gorgas Library Core Support - Phase II Early Demolition Package -
July 26, 2022
Renovation and Addition
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
College/Division | University Libraries |
Status | Active |
Construction Phase | Construction |
Construction Type | Renovation |
GSF | 11,800 |
Street Address | 711 Capstone Drive |
Zone | 1 |
Project Number | 013-21-2678 |
Architect | CMH Architects |
Project Manager | Mary Kathryn Holt |
Project Admin | Katie Crocker-Buta |
Field Coordinator | Chuck Hinton |
General Contractor | J.T. Harrison Construction Co., Inc. |
Interior Designer | |
Bid Date | July 26, 2022 |
Construction Start | March 2023 |
Scheduled Construction End | May 2024 |
COSC Date | TBD |
Year End Inspection | TBD |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/013-21-2678 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90957 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/584096 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The proposed Gorgas Library Core Support, Phase II project (“Project”) is a critical step in the realignment of library space in order to meet the strategic plan of The University of Alabama and to transform University libraries as necessary to support the academic mission and the teaching, research and learning environment. The Project will address deferred maintenance needs and install core infrastructure to support future development in coordination with the Gorgas Library Master Plan. The interior scope includes new mechanical and fire pump rooms to house the new campus central thermal connection interface for hot and chilled water and fire water service. A new electrical room will provide a service feed to the new main switchboard in the building. A stairwell conversion will provide area inside the building for the new data, electrical and mechanical rooms and mechanical chase. |
Renderings | |
Budget | 15773338 |
Banner Fund Number | 90957 |
Project Accountant | Sonia Wilkins |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=63B2AF52-AA01-40EA-BEBA-27B2957FB82E |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |