Gorgas Library Core Support, Phase II

  • 711 Capstone Drive
Information at a Glance

Use

Academic

Status

Active

Construction Type

Renovation

Current Phase

Construction

College or Division

University Libraries

CA Filing Code

013-21-2678

Project GSF

11,800

Bid Date

July 26, 2022

Construction Start

March 2023

Construction End

May 2024

COSC Date

' TBD

Project Architect

CMH Architects

General Contractor

J.T. Harrison Construction Co., Inc.

Project Manager

Mary Kathryn Holt

Field Coordinator

Chuck Hinton

Project Admin

Katie Crocker-Buta

Project Summary

The proposed Gorgas Library Core Support, Phase II project (“Project”) is a critical step in the realignment of library space in order to meet the strategic plan of The University of Alabama and to transform University libraries as necessary to support the academic mission and the teaching, research and learning environment. The Project will address deferred maintenance needs and install core infrastructure to support future development in coordination with the Gorgas Library Master Plan.

The interior scope includes new mechanical and fire pump rooms to house the new campus central thermal connection interface for hot and chilled water and fire water service. A new electrical room will provide a service feed to the new main switchboard in the building. A stairwell conversion will provide area inside the building for the new data, electrical and mechanical rooms and mechanical chase.


Information at a Glance

BOT Budget

$15,773,338

Funding Sources

  • University Central Reserves :
    $13,738,310

Banner/Project #

90957

Project Accountant

Sonia Wilkins

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division University Libraries
Status Active
Construction Phase Construction
Construction Type Renovation
GSF 11,800
Street Address 711 Capstone Drive
Zone 1
Project Number 013-21-2678
Architect CMH Architects
Project Manager Mary Kathryn Holt
Project Admin Katie Crocker-Buta
Field Coordinator Chuck Hinton
General Contractor J.T. Harrison Construction Co., Inc.
Interior Designer
Bid Date July 26, 2022
Construction Start March 2023
Scheduled Construction End May 2024
COSC Date TBD
Year End Inspection TBD
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/013-21-2678
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90957
Campus Map Link https://map.concept3d.com/?id=1222#!m/584096
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed Gorgas Library Core Support, Phase II project (“Project”) is a critical step in the realignment of library space in order to meet the strategic plan of The University of Alabama and to transform University libraries as necessary to support the academic mission and the teaching, research and learning environment. The Project will address deferred maintenance needs and install core infrastructure to support future development in coordination with the Gorgas Library Master Plan.

The interior scope includes new mechanical and fire pump rooms to house the new campus central thermal connection interface for hot and chilled water and fire water service. A new electrical room will provide a service feed to the new main switchboard in the building. A stairwell conversion will provide area inside the building for the new data, electrical and mechanical rooms and mechanical chase.

Renderings
Budget 15773338
Banner Fund Number 90957
Project Accountant Sonia Wilkins
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=63B2AF52-AA01-40EA-BEBA-27B2957FB82E
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage