Capstone College of Nursing Addition and Renovation

  • 650 University Boulevard East
Information at a Glance

Use

Academic

Status

Active

Construction Type

Renovation and Addition

Current Phase

Design

College or Division

Capstone College of Nursing

CA Filing Code

010-25-4110

Project GSF

81,275

Bid Date

TBD

Construction Start

TBD

Construction End

TBD

Project Architect

TurnerBatson Architects

General Contractor

TBD

Project Manager

Suzanne Webster

Project Summary

The Capstone College of Nursing Addition and Renovation project (“Project”) will include the renovation of approximately 31,175 existing gross square feet (“GSF”) within the Capstone College of Nursing, as well as the construction of a 50,100 GSF addition that will support the program expansion for a total project of approximately 81,275 GSF.

The Project will include research space, classrooms, clinical spaces, offices, and appropriate service and support space. Modified mechanical, plumbing, electrical and life safety systems, and all University-standard enterprise systems such as networking, access control and security, and audio-visual technology will be provided to support the academic mission of the college.

A Pedestrian Bridge is proposed as part of the Project to allow for safer access for the students, faculty, and staff who walk to and from DCH Regional Medical Center, where portions of the required curriculum take place.


Information at a Glance

BOT Budget

$80,750,000

Funding Sources

  • Future General Revenue Bonds :
    $67,041,068
  • University Central Reserves :
    $13,708,932
BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Academic
College/Division Capstone College of Nursing
Status Active
Construction Phase Design
Construction Type Renovation and Addition
Street Address 650 University Boulevard East
Zone
GSF 81,275
Project Number 010-25-4110
Architect TurnerBatson Architects
General Contractor TBD
Project Manager Suzanne Webster
Project Admin
Field Coordinator
Interior Designer
Bid Date TBD
Construction Start TBD
Scheduled Construction End TBD
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Capstone College of Nursing Addition and Renovation project (“Project”) will include the renovation of approximately 31,175 existing gross square feet (“GSF”) within the Capstone College of Nursing, as well as the construction of a 50,100 GSF addition that will support the program expansion for a total project of approximately 81,275 GSF.

The Project will include research space, classrooms, clinical spaces, offices, and appropriate service and support space. Modified mechanical, plumbing, electrical and life safety systems, and all University-standard enterprise systems such as networking, access control and security, and audio-visual technology will be provided to support the academic mission of the college.

A Pedestrian Bridge is proposed as part of the Project to allow for safer access for the students, faculty, and staff who walk to and from DCH Regional Medical Center, where portions of the required curriculum take place.

Renderings
Budget 80750000
Banner Fund Number
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage