Beta Theta Pi Rear Addition

  • 960 University Blvd
Information at a Glance

Use

Greek

Status

Active

Construction Type

Addition

Current Phase

Construction

College or Division

Division of Student Life

CA Filing Code

908-24-3605

Project GSF

1,500

Bid Date

July 2024

Construction Start

August 2024

Construction End

TBD

Project Architect

Ellis Architects, Inc.

General Contractor

Central Alabama Asphalt & Construction Co., LLC

Project Manager

Michael Hand

Field Coordinator

TBD

Project Admin

Bethany Fenimore

Project Summary

The proposed Beta Theta Pi Rear Addition project, located at 960 University Boulevard, will consist of an addition to the existing recreation room at the rear of the fraternity house. The renovation will enhance the functionality of the current recreation room and bring the house closer to current trends in Greek life which should aid in future recruitment and chapter growth.

The addition includes a 1,200 square foot extension of the current recreation room, approximately doubling the size of the space, as well as a 300 square foot storage room for much needed storage capacity, making the total Project addition approximately 1,500 square feet. The area to the east of the new addition will be replaced with hardscape to make a new outdoor gathering area, reducing maintenance expenses for the Chapter and further aiding in chapter growth.

The addition will be in general alignment with the back of the adjacent Phi Gamma Delta and Sigma Nu houses. Careful attention will be made to ensure that the materials used in the addition will match the existing house.

The Project will be executed in two phases: a preliminary Utility and Infrastructure relocation package, tentatively planned for Summer 2024, and the Addition package, to be executed Fall 2024.


Information at a Glance

BOT Budget

$1,409,361.00

Funding Sources

  • Chapter Funds :
    $1,409,361

Banner/Project #

91253

Project Accountant

Sonia Wilkins

DATA LABEL DATA VALUE
Category Greek
College/Division Division of Student Life
Status Active
Construction Phase Construction
Construction Type Addition
GSF 1,500
Street Address 960 University Blvd
Zone
Project Number 908-24-3605
Architect Ellis Architects, Inc.
Project Manager Michael Hand
Project Admin Bethany Fenimore
Field Coordinator TBD
General Contractor Central Alabama Asphalt & Construction Co., LLC
Interior Designer
Bid Date July 2024
Construction Start August 2024
Scheduled Construction End TBD
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/9VD1V/908-24-3605
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=91254
Campus Map Link https://map.concept3d.com/?id=1222#!ce/31483?ct/31490,31883,31890,31891?m/920293?s/?mc/33.21100199999999,-87.550659?z/17.98528828678972?lvl/0?share
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The proposed Beta Theta Pi Rear Addition project, located at 960 University Boulevard, will consist of an addition to the existing recreation room at the rear of the fraternity house. The renovation will enhance the functionality of the current recreation room and bring the house closer to current trends in Greek life which should aid in future recruitment and chapter growth.

The addition includes a 1,200 square foot extension of the current recreation room, approximately doubling the size of the space, as well as a 300 square foot storage room for much needed storage capacity, making the total Project addition approximately 1,500 square feet. The area to the east of the new addition will be replaced with hardscape to make a new outdoor gathering area, reducing maintenance expenses for the Chapter and further aiding in chapter growth.

The addition will be in general alignment with the back of the adjacent Phi Gamma Delta and Sigma Nu houses. Careful attention will be made to ensure that the materials used in the addition will match the existing house.

The Project will be executed in two phases: a preliminary Utility and Infrastructure relocation package, tentatively planned for Summer 2024, and the Addition package, to be executed Fall 2024.

Renderings
Budget 1409361
Banner Fund Number 91253
Project Accountant Sonia Wilkins
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage