Athletic Venues Wi-Fi Expansion and Enhancements
- Bryant-Denny Stadium; Coleman Coliseum
Use
Athletics
Status
Construction Type
Addition
Current Phase
Construction
College or Division
Intercollegiate Athletics
The Athletic Venues Wi-Fi Expansion and Enhancements project will consist of the deployment of 140 network switches and 1,998 wireless access points in Bryant-Denny Stadium as well as the needed network switches and wireless access points in Coleman Coliseum to support the data connectivity needs of Athletics Operations and its fans.
The project involves miles of low voltage cabling and pathway to be installed into the facilities. The bulk of the labor involved at Bryant-Denny Stadium will be the core-drilling of holes required for the many under-seat access point locations that have been designed. The coverage areas of this project at Bryant-Denny include the main bowl of the stadium, concourses, skyboxes and other premium areas, all back-of-house and office areas, exterior gates, walk-of-champions, as well as “Champions Lane” (fan fest field area). Coleman Coliseum includes the main seating area, concourse, premium/club areas, as well as back-of-house and office areas.
BOT Budget
$13,300,000.00
Funding Sources
-
Crimson Tide Foundation :
$13,300,000
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Athletics |
College/Division | Intercollegiate Athletics |
Status | Active |
Construction Phase | Construction |
Construction Type | Addition |
GSF | |
Street Address | Bryant-Denny Stadium; Coleman Coliseum |
Zone | |
Project Number | |
Architect | |
Project Manager | |
Project Admin | |
Field Coordinator | |
General Contractor | |
Interior Designer | |
Bid Date | |
Construction Start | |
Scheduled Construction End | |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX |
Campus Map Link | |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
The Athletic Venues Wi-Fi Expansion and Enhancements project will consist of the deployment of 140 network switches and 1,998 wireless access points in Bryant-Denny Stadium as well as the needed network switches and wireless access points in Coleman Coliseum to support the data connectivity needs of Athletics Operations and its fans. The project involves miles of low voltage cabling and pathway to be installed into the facilities. The bulk of the labor involved at Bryant-Denny Stadium will be the core-drilling of holes required for the many under-seat access point locations that have been designed. The coverage areas of this project at Bryant-Denny include the main bowl of the stadium, concourses, skyboxes and other premium areas, all back-of-house and office areas, exterior gates, walk-of-champions, as well as “Champions Lane” (fan fest field area). Coleman Coliseum includes the main seating area, concourse, premium/club areas, as well as back-of-house and office areas. |
Renderings | |
Budget | 13300000 |
Banner Fund Number | |
Project Accountant | |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |