2nd Avenue & 15th Street Intersection

Information at a Glance

Use

Utilities & Infrastructure

Status

Active

Construction Type

Other

Current Phase

Design

College or Division

Other

CA Filing Code

TRN-17-1106

Project GSF

N/A

Construction End

September 2022

Project Architect

McGiffert and Associates

Project Manager

David Welch

Project Admin

Katie Crocker-Buta

Project Summary

Now that the 2nd Avenue Overpass project is complete, the University is proposing to widen the previously deferred connector road from the southern terminus of the Overpass south to the intersection of 2nd Avenue and 15th Street (AL HWY 215) including the 15th Street intersection. This will include University standard decorative traffic signals at 15th Street and lighting along 2nd Avenue south. The University also proposes to add new sidewalks that will tie into future City Walk sidewalks along 15th Street and along 14th Street to the west and landscaping along 15th Street and 2nd Avenue to improve the aesthetics of the new gateway into campus. University standard signage and wayfinding will also be included. 

The Alabama Transportation Rehabilitation and Improvement Program-II (ATRIP-II) was established to rehabilitate and improve transportation infrastructure by funding projects of local benefit. The City of Tuscaloosa, in partnership with the University, was awarded $761,300 towards these improvements along 15th Street (AL SR 215) as part of the Project. 


Information at a Glance

BOT Budget

$2,810,200.00

Funding Sources

  • ATRIP-II Grant :
    $761,300
  • University Central Reserves:
    $2,048,900

Banner/Project #

94996

Project Accountant

Kimberly Lee

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division Other
Status Active
Construction Phase Design
Construction Type Other
GSF N/A
Street Address
Zone
Project Number TRN-17-1106
Architect McGiffert and Associates
Project Manager David Welch
Project Admin Katie Crocker-Buta
Field Coordinator
General Contractor
Interior Designer
Bid Date
Construction Start
Scheduled Construction End September 2022
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link https://bama365.sharepoint.com/sites/7M27T/TRN-17-1106/default.aspx
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=94996
Campus Map Link https://map.concept3d.com/?id=1222#!m/584099
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

Now that the 2nd Avenue Overpass project is complete, the University is proposing to widen the previously deferred connector road from the southern terminus of the Overpass south to the intersection of 2nd Avenue and 15th Street (AL HWY 215) including the 15th Street intersection. This will include University standard decorative traffic signals at 15th Street and lighting along 2nd Avenue south. The University also proposes to add new sidewalks that will tie into future City Walk sidewalks along 15th Street and along 14th Street to the west and landscaping along 15th Street and 2nd Avenue to improve the aesthetics of the new gateway into campus. University standard signage and wayfinding will also be included. 

The Alabama Transportation Rehabilitation and Improvement Program-II (ATRIP-II) was established to rehabilitate and improve transportation infrastructure by funding projects of local benefit. The City of Tuscaloosa, in partnership with the University, was awarded $761,300 towards these improvements along 15th Street (AL SR 215) as part of the Project. 

Renderings
Budget 2810200
Banner Fund Number 94996
Project Accountant Kimberly Lee
Funding Source(s) Array
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s) Array
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage Array