2nd Avenue & 15th Street Intersection
Use
Utilities & Infrastructure
Status
Construction Type
Other
Current Phase
Design
College or Division
Other
CA Filing Code
TRN-17-1106
Project GSF
N/A
Construction End
September 2022
Project Architect
McGiffert and Associates
Project Manager
David Welch
Project Admin
Katie Crocker-Buta
Now that the 2nd Avenue Overpass project is complete, the University is proposing to widen the previously deferred connector road from the southern terminus of the Overpass south to the intersection of 2nd Avenue and 15th Street (AL HWY 215) including the 15th Street intersection. This will include University standard decorative traffic signals at 15th Street and lighting along 2nd Avenue south. The University also proposes to add new sidewalks that will tie into future City Walk sidewalks along 15th Street and along 14th Street to the west and landscaping along 15th Street and 2nd Avenue to improve the aesthetics of the new gateway into campus. University standard signage and wayfinding will also be included.
The Alabama Transportation Rehabilitation and Improvement Program-II (ATRIP-II) was established to rehabilitate and improve transportation infrastructure by funding projects of local benefit. The City of Tuscaloosa, in partnership with the University, was awarded $761,300 towards these improvements along 15th Street (AL SR 215) as part of the Project.
BOT Budget
$2,810,200.00
Funding Sources
-
ATRIP-II Grant :
$761,300 -
University Central Reserves:
$2,048,900
Banner/Project #
94996
Project Accountant
Kimberly Lee
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
DATA LABEL | DATA VALUE |
---|---|
Category | Utilities & Infrastructure |
College/Division | Other |
Status | Active |
Construction Phase | Design |
Construction Type | Other |
GSF | N/A |
Street Address | |
Zone | |
Project Number | TRN-17-1106 |
Architect | McGiffert and Associates |
Project Manager | David Welch |
Project Admin | Katie Crocker-Buta |
Field Coordinator | |
General Contractor | |
Interior Designer | |
Bid Date | |
Construction Start | |
Scheduled Construction End | September 2022 |
COSC Date | |
Year End Inspection | |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/7M27T/TRN-17-1106/default.aspx |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=94996 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/584099 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary | Now that the 2nd Avenue Overpass project is complete, the University is proposing to widen the previously deferred connector road from the southern terminus of the Overpass south to the intersection of 2nd Avenue and 15th Street (AL HWY 215) including the 15th Street intersection. This will include University standard decorative traffic signals at 15th Street and lighting along 2nd Avenue south. The University also proposes to add new sidewalks that will tie into future City Walk sidewalks along 15th Street and along 14th Street to the west and landscaping along 15th Street and 2nd Avenue to improve the aesthetics of the new gateway into campus. University standard signage and wayfinding will also be included. The Alabama Transportation Rehabilitation and Improvement Program-II (ATRIP-II) was established to rehabilitate and improve transportation infrastructure by funding projects of local benefit. The City of Tuscaloosa, in partnership with the University, was awarded $761,300 towards these improvements along 15th Street (AL SR 215) as part of the Project. |
Renderings | |
Budget | 2810200 |
Banner Fund Number | 94996 |
Project Accountant | Kimberly Lee |
Funding Source(s) | Array |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | Array |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage | Array |