Athletic Venues Wi-Fi Expansion and Enhancements

  • Bryant-Denny Stadium; Coleman Coliseum
Information at a Glance

Use

Athletics

Status

Active

Construction Type

Addition

Current Phase

Construction

College or Division

Intercollegiate Athletics

Project Summary

The Athletic Venues Wi-Fi Expansion and Enhancements project will consist of the deployment of 140 network switches and 1,998 wireless access points in Bryant-Denny Stadium as well as the needed network switches and wireless access points in Coleman Coliseum to support the data connectivity needs of Athletics Operations and its fans.

The project involves miles of low voltage cabling and pathway to be installed into the facilities. The bulk of the labor involved at Bryant-Denny Stadium will be the core-drilling of holes required for the many under-seat access point locations that have been designed. The coverage areas of this project at Bryant-Denny include the main bowl of the stadium, concourses, skyboxes and other premium areas, all back-of-house and office areas, exterior gates, walk-of-champions, as well as “Champions Lane” (fan fest field area). Coleman Coliseum includes the main seating area, concourse, premium/club areas, as well as back-of-house and office areas.


Information at a Glance

BOT Budget

$13,300,000.00

Funding Sources

  • Crimson Tide Foundation :
    $13,300,000
BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Athletics
College/Division Intercollegiate Athletics
Status Active
Construction Phase Construction
Construction Type Addition
GSF
Street Address Bryant-Denny Stadium; Coleman Coliseum
Zone
Project Number
Architect
Project Manager
Project Admin
Field Coordinator
General Contractor
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The Athletic Venues Wi-Fi Expansion and Enhancements project will consist of the deployment of 140 network switches and 1,998 wireless access points in Bryant-Denny Stadium as well as the needed network switches and wireless access points in Coleman Coliseum to support the data connectivity needs of Athletics Operations and its fans.

The project involves miles of low voltage cabling and pathway to be installed into the facilities. The bulk of the labor involved at Bryant-Denny Stadium will be the core-drilling of holes required for the many under-seat access point locations that have been designed. The coverage areas of this project at Bryant-Denny include the main bowl of the stadium, concourses, skyboxes and other premium areas, all back-of-house and office areas, exterior gates, walk-of-champions, as well as “Champions Lane” (fan fest field area). Coleman Coliseum includes the main seating area, concourse, premium/club areas, as well as back-of-house and office areas.

Renderings
Budget 13300000
Banner Fund Number
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage