Systems Safety Enhancements for EHS Warehouse

  • 1470 Warrior Drive
Information at a Glance

Use

Utilities & Infrastructure

Status

Active

Construction Type

Other

Current Phase

Construction

College or Division

Other

Project Summary

The University of Alabama will purchase and install new HVAC equipment and Electrical Generator Equipment to serve the Environmental, Health, and Safety (EHS) Warehouse. This installation will provide enhanced and redundant operational systems to support the facility operations associated with the chemical storage and radiation laboratory to meet emerging operational requirements and regulations.


Information at a Glance

BOT Budget

$2,545,263.00

Funding Sources

  • University Central Reserves :
    $2,545,263
BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

Stage 3

Stage 4

View Board Manual
DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division Other
Status Active
Construction Phase Construction
Construction Type Other
GSF
Street Address 1470 Warrior Drive
Zone
Project Number
Architect
Project Manager
Project Admin
Field Coordinator
General Contractor
Interior Designer
Bid Date
Construction Start
Scheduled Construction End
COSC Date
Year End Inspection
Fundraising Site
SharePoint Active Project Site Link
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=XXXXX
Campus Map Link
BIR Building Link https://bama365.sharepoint.com/sites/98C3D/default.aspx
Closeout Documents Link
View Warranty Documents
Project Summary

The University of Alabama will purchase and install new HVAC equipment and Electrical Generator Equipment to serve the Environmental, Health, and Safety (EHS) Warehouse. This installation will provide enhanced and redundant operational systems to support the facility operations associated with the chemical storage and radiation laboratory to meet emerging operational requirements and regulations.

Renderings
Budget 2545263
Banner Fund Number
Project Accountant
Funding Source(s)
Construction Dashboard Link
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
View Bid Tab https://constructionpublicinfo.ua.edu/certified-bid-tabs/
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
ePIRPAF Link
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site
RFQ Documents
Advertisement for Bids
Bid Tabulations
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
360 Embed Code
BOT Stage