University Club Restoration and Additions
- 421 Queen City Avenue
Use
Other
Status
Construction Type
Renovation
Current Phase
Construction
College or Division
Other
CA Filing Code
207-22-3017
Project GSF
15,729
Bid Date
March 8, 2023
Construction Start
April 17, 2023
Construction End
April 2024
COSC Date
' TBD
Project Architect
Cole & Cole Architects
General Contractor
J.T. Harrison Construction Co., Inc.
Project Manager
Steven Mercado
Field Coordinator
Joe Daidone
Project Admin
Cassidy Largin
Link: University Club Website
Package A Building Restoration
The University Club is a historic two-story Greek Revival structure with stucco veneer over solid masonry walls and a slate roof. Several additions have been added over the years. The scope of the proposed project involves a full restoration of the facility, excluding the kitchen, service yard and administrative wings. The existing reception, dining and special event spaces will be renovated and will continue to be used in similar capacities following the restoration. The existing south parlor will be repurposed as a lounge, casual dining area, and bar. The future south and east additions will include enhanced vertical circulation, additional dining space, a stairwell, expanded restrooms, and event space. The existing north parlor will be repurposed as a workspace with a similar concept to a hotel lobby. A boardroom will be added to the second floor. The south elevation of the building will feature a spacious balcony that overlooks the south garden and University Boulevard. This Project will also provide the opportunity to bring coherence between the numerous additions to the building while providing architecturally accurate execution of the massing, exterior detailing, elements, and materials as appropriate for this significant structure.
Package B Select Interior Demolition
The select interior demolition package will open up the ceilings, walls and floors to aid in design by exposing the building’s structure for evaluation and to facilitate future work. This package will also include the protection of elements which will stay in place during construction. The interior demolition will also expedite the building restoration by allowing the contractor to start immediately on advancing work.
Package C Elevators
The elevator package is needed for early procurement of long lead time elevator equipment in order to meet the Project schedule. Two elevators will be provided in the facility so as to separate service and patron use.
Package D Window Restoration
The window restoration package is needed to maintain the original architectural authenticity of the original front elevation and to expedite the construction of Package A’s restoration work. This package restored fifteen original windows, five transom windows and four sidelights.
Package E Sitework
The sitework package provided the stormwater, a new domestic water line, and a new fire water line to the University Club site. This work was scheduled to take place over the winter break to avoid work on University Boulevard so as to minimize the disruption to the campus community. The Project will address significant deferred maintenance needs including building envelope and building support systems and infrastructure.
The Project will include careful and appropriate attention to restoring and conserving the interior while honoring the building’s historic character.
Link: Tuscaloosa News Article
BOT Budget
$17,430,000.00
Funding Sources
-
University Central Reserves :
$17,430,000
Banner/Project #
90982
Project Accountant
Parker Christian
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
October 25, 2022
Elevator Package -
October 27, 2022
Window Package -
November 15, 2022
Site Package -
March 8, 2023
Main Construction Package
DATA LABEL | DATA VALUE |
---|---|
Category | Other |
College/Division | Other |
Status | Active |
Construction Phase | Construction |
Construction Type | Renovation |
GSF | 15,729 |
Street Address | 421 Queen City Avenue |
Zone | 5 |
Project Number | 207-22-3017 |
Architect | Cole & Cole Architects |
Project Manager | Steven Mercado |
Project Admin | Cassidy Largin |
Field Coordinator | Joe Daidone |
General Contractor | J.T. Harrison Construction Co., Inc. |
Interior Designer | |
Bid Date | March 8, 2023 |
Construction Start | April 17, 2023 |
Scheduled Construction End | April 2024 |
COSC Date | TBD |
Year End Inspection | TBD |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/9VD1V/207-22-3017 |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90982 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/643065 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/default.aspx |
Closeout Documents Link | |
View Warranty Documents | |
Project Summary |
Link: University Club WebsitePackage A Building Restoration The University Club is a historic two-story Greek Revival structure with stucco veneer over solid masonry walls and a slate roof. Several additions have been added over the years. The scope of the proposed project involves a full restoration of the facility, excluding the kitchen, service yard and administrative wings. The existing reception, dining and special event spaces will be renovated and will continue to be used in similar capacities following the restoration. The existing south parlor will be repurposed as a lounge, casual dining area, and bar. The future south and east additions will include enhanced vertical circulation, additional dining space, a stairwell, expanded restrooms, and event space. The existing north parlor will be repurposed as a workspace with a similar concept to a hotel lobby. A boardroom will be added to the second floor. The south elevation of the building will feature a spacious balcony that overlooks the south garden and University Boulevard. This Project will also provide the opportunity to bring coherence between the numerous additions to the building while providing architecturally accurate execution of the massing, exterior detailing, elements, and materials as appropriate for this significant structure. Package B Select Interior Demolition The select interior demolition package will open up the ceilings, walls and floors to aid in design by exposing the building’s structure for evaluation and to facilitate future work. This package will also include the protection of elements which will stay in place during construction. The interior demolition will also expedite the building restoration by allowing the contractor to start immediately on advancing work. Package C Elevators The elevator package is needed for early procurement of long lead time elevator equipment in order to meet the Project schedule. Two elevators will be provided in the facility so as to separate service and patron use. Package D Window Restoration The window restoration package is needed to maintain the original architectural authenticity of the original front elevation and to expedite the construction of Package A’s restoration work. This package restored fifteen original windows, five transom windows and four sidelights. Package E Sitework The sitework package provided the stormwater, a new domestic water line, and a new fire water line to the University Club site. This work was scheduled to take place over the winter break to avoid work on University Boulevard so as to minimize the disruption to the campus community. The Project will address significant deferred maintenance needs including building envelope and building support systems and infrastructure. The Project will include careful and appropriate attention to restoring and conserving the interior while honoring the building’s historic character. Link: Tuscaloosa News Article |
Renderings | |
Budget | 17430000 |
Banner Fund Number | 90982 |
Project Accountant | Parker Christian |
Funding Source(s) | |
Construction Dashboard Link | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
View Bid Tab | https://constructionpublicinfo.ua.edu/certified-bid-tabs/ |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
ePIRPAF Link | |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
RFQ Documents | |
Advertisement for Bids | |
Bid Tabulations | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
360 Embed Code | |
BOT Stage |