John H. England, Jr. Hall
- 810 2nd Street, Tuscaloosa, Alabama 35487
Use
Residential
Status
Closed
Construction Type
New Construction
Current Phase
Complete
College or Division
Division of Student Life
Bed Count
494
CA Filing Code
272-16-952
Project GSF
166,989
Bid Date
May 25, 2017
Construction Start
June 2017
Construction End
August 2018
COSC Date
' August 6, 2018
Project Architect
Williams Blackstock
General Contractor
Caddell Construction
Project Manager
Steven Mercado (8-4640)
Field Coordinator
Jon Chesnut (8-1684)
Interior Designer
Leah Shepherd (8-8450)
Project Admin
Brittney Fox (8-5577)
Opened in fall 2018 as a freshmen residence, the John H. England Jr. Hall offers a fully furnished double occupancy room with a private bathroom shared only with a roommate. A convenience store is located on the 1st floor, as is a community kitchen. Each floor features access to laundry. The hall is named for one of the University’s and state’s greatest civic leaders, the Honorable John H. England Jr., a member of the Board of Trustees of The University of Alabama System and circuit judge in Tuscaloosa. A virtual tour is available at the Housing and Residential Communities website.
BOT Budget
$51,249,377
Funding Sources
-
University Funds :
$51,249,377
Banner/Project #
90727
Project Accountant
Elsie Smith (8-8340)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
January 26, 2017
Early Sitework and Utilities -
March 22, 2017
Structural Package -
May 25, 2017
Building Package
DATA LABEL | DATA VALUE |
---|---|
Category | Residential |
College/Division | Division of Student Life |
Bed Count | 494 |
Status | Closed |
Construction Phase | Complete |
Construction Type | New Construction |
GSF | 166,989 |
Street Address | 810 2nd Street, Tuscaloosa, Alabama 35487 |
Zone | |
Project Number | 272-16-952 |
Architect | Williams Blackstock |
Project Manager | Steven Mercado (8-4640) |
Project Admin | Brittney Fox (8-5577) |
Field Coordinator | Jon Chesnut (8-1684) |
General Contractor | Caddell Construction |
Interior Designer | Leah Shepherd (8-8450) |
Bid Date | May 25, 2017 |
Construction Start | June 2017 |
Scheduled Construction End | August 2018 |
Fundraising Site | |
SharePoint Active Project Site Link | https://uafinancialaffairs.sharepoint.com/sites/7M27T/272-16-952/ |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90727 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/327663 |
BIR Building Link | https://uafinancialaffairs.sharepoint.com/sites/98C3D/Zone2/buildings/272/default.aspx |
Construction Photos Link | |
Project Summary |
Opened in fall 2018 as a freshmen residence, the John H. England Jr. Hall offers a fully furnished double occupancy room with a private bathroom shared only with a roommate. A convenience store is located on the 1st floor, as is a community kitchen. Each floor features access to laundry. The hall is named for one of the University’s and state’s greatest civic leaders, the Honorable John H. England Jr., a member of the Board of Trustees of The University of Alabama System and circuit judge in Tuscaloosa. A virtual tour is available at the Housing and Residential Communities website. |
Renderings | |
Budget | 51249377 |
Banner Fund Number | 90727 |
Project Accountant | Elsie Smith (8-8340) |
Funding Source(s) | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=4AF970DF-DC04-4AB3-A0B5-F7B9B87FB462 |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90727&detail=all |
View Bid Tab | https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Freshman-Residence-Hall-Building-Package-272-16-952C-5-25-17.pdf |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
COSC Date | August 6, 2018 |
Year End Inspection | August 6, 2019 |
View Warranty Documents | |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code |