Tutwiler Triangle Lot Stormwater Management

  • 10th Avenue along Bryant Drive, Tuscaloosa, Alabama 35487
Information at a Glance

Use

Utilities & Infrastructure

Status

Closed

Construction Type

Other

Current Phase

Complete

College or Division

Division of Finance and Operations

CA Filing Code

UTL-19-2010

Project GSF

NA

Bid Date

September 17, 2019

Construction Start

November 2019

Construction End

July 28, 2020

COSC Date

' 08/04/2020

Project Architect

McGiffert and Associates

General Contractor

WAR Construction

Project Manager

David Jones (8-3712)

Field Coordinator

Jon Chesnut (8-1684)

Interior Designer

NA

Project Admin

Brittney Fox (8-5577)

Information at a Glance

BOT Budget

$7,712,988.00

Funding Sources

  • 2019 General Revenue Bonds :
    $6,712,988
  • Pending - The City of Tuscaloosa :
    $1,000,000

Banner/Project #

90875

Project Accountant

Sherell Harrison (8-6838)

BOT Submissions
STAGE PACKAGE INFORMATION

Stage 1

Stage 2

  • SEE STAGE I

Stage 3

Stage 4

DATA LABEL DATA VALUE
Category Utilities & Infrastructure
College/Division Division of Finance and Operations
Status Closed
Construction Phase Complete
Construction Type Other
GSF NA
Street Address 10th Avenue along Bryant Drive, Tuscaloosa, Alabama 35487
Zone
Project Number UTL-19-2010
Architect McGiffert and Associates
Project Manager David Jones (8-3712)
Project Admin Brittney Fox (8-5577)
Field Coordinator Jon Chesnut (8-1684)
General Contractor WAR Construction
Interior Designer NA
Bid Date September 17, 2019
Construction Start November 2019
Scheduled Construction End July 28, 2020
Fundraising Site
SharePoint Active Project Site Link https://uafinancialaffairs.sharepoint.com/sites/9VD1V/UTL-19-2010/
AiM Link https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90875
Campus Map Link https://map.concept3d.com/?id=1222#!m/436357
BIR Building Link https://uafinancialaffairs.sharepoint.com/sites/98C3D/default.aspx
Construction Photos Link
Project Summary
Renderings
Budget 7712988
Banner Fund Number 90875
Project Accountant Sherell Harrison (8-6838)
Funding Source(s)
ePIRPAF Link https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=2BB6F430-A03E-4095-A4EC-FDA377BE5E73
Construction Dashboard Link https://spd.ua.edu/construction/Awards/Funds?fund=90875&detail=all
View Bid Tab https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Tutwiler-Triangle-Lot-Storm-Water-Management-UTL-19-2010.pdf
Link to Awarded Contracts Dashboard https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard
Link to eCORAF https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList
Link to ePayApp https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard
Stage 1 BOT Submittal(s)
Stage 2 BOT Submittal(s)
Stage 3 BOT Submittal(s)
Stage 4 BOT Submittal(s)
BOT Site https://uafinancialaffairs.sharepoint.com/sites/6JDXH/BOTProjects/BOT-156/default.aspx
COSC Date 08/04/2020
Year End Inspection TBD
View Warranty Documents
Link to Bid Site https://constructionpublicinfo.ua.edu/bids/
Consultant Agreements https://constructionpublicinfo.ua.edu/agreements/
Design Guidelines https://constructionpublicinfo.ua.edu/design-guidelines/
Front End Documents https://constructionpublicinfo.ua.edu/front-end-documents/
Instructions Link https://constructionpublicinfo.ua.edu/public-forms/
Advertisement for Bids
Closeout Documents Link
RFQ Documents
Bid Tabulations
360 Embed Code