University Hall Renovation
- Peter Bryce Campus
Use
Academic
Status
Construction Type
Renovation
Current Phase
Complete
College or Division
College of Continuing Studies
CA Filing Code
420-17-1006
Project GSF
75,973
Bid Date
December 7, 2017
Construction Start
February 2018
Construction End
August 2019
COSC Date
' July 19, 2019
Project Architect
Williams Blackstock
General Contractor
Bailey Harris
Project Manager
Ben Youngblood (8-7574)
Field Coordinator
Ed Sawyer (8-1684)
Interior Designer
Michael Hand (8-8456)
Project Admin
TBD
With the completion of this project, University Hall is now the new home of the College of Continuing Studies programs. The first floor supports New College LIfe Track, Instructional Technology and Academic Services, and Safe State and Information Technology. The second floor will house Early College, and the third floor will support the Dean’s Office along with support operations.
The scope of this project included the stabilization of the building envelope and interior renovations. The existing building is a masonry and concrete structure over a crawlspace — constructed around 1938.
BOT Budget
$25,923,159.00
Funding Sources
-
General Revenue Bonds :
$25,923,159
Banner/Project #
94963
Project Accountant
Cindy Fowler (8-5460)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
July 20, 2017
Selective Demolition and Abatement Package -
December 7, 2017
Renovation Package -
May 3, 2018
Utilities Package -
December 4, 2018
Studio Fitout Package
DATA LABEL | DATA VALUE |
---|---|
Category | Academic |
College/Division | College of Continuing Studies |
Status | Closed |
Construction Phase | Complete |
Construction Type | Renovation |
GSF | 75,973 |
Street Address | Peter Bryce Campus |
Zone | |
Project Number | 420-17-1006 |
Architect | Williams Blackstock |
Project Manager | Ben Youngblood (8-7574) |
Project Admin | TBD |
Field Coordinator | Ed Sawyer (8-1684) |
General Contractor | Bailey Harris |
Interior Designer | Michael Hand (8-8456) |
Bid Date | December 7, 2017 |
Construction Start | February 2018 |
Scheduled Construction End | August 2019 |
Fundraising Site | |
SharePoint Active Project Site Link | https://bama365.sharepoint.com/sites/7M27T/420-17-1006/default.aspx |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=94963 |
Campus Map Link | https://map.concept3d.com/?id=1222#!m/439566 |
BIR Building Link | https://bama365.sharepoint.com/sites/98C3D/Zone3/buildings/Bryce%20Campus/420/default.aspx |
Construction Photos Link | |
Project Summary |
With the completion of this project, University Hall is now the new home of the College of Continuing Studies programs. The first floor supports New College LIfe Track, Instructional Technology and Academic Services, and Safe State and Information Technology. The second floor will house Early College, and the third floor will support the Dean’s Office along with support operations. The scope of this project included the stabilization of the building envelope and interior renovations. The existing building is a masonry and concrete structure over a crawlspace — constructed around 1938. |
Renderings | |
Budget | 25923159 |
Banner Fund Number | 94963 |
Project Accountant | Cindy Fowler (8-5460) |
Funding Source(s) | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=75F8DAD2-2D26-420F-A5A6-9F1AD9550F97 |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=94963&detail=all |
View Bid Tab | https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/University-Hall-Renovation-420-17-1006B-12-7-17.pdf |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
COSC Date | July 19, 2019 |
Year End Inspection | |
View Warranty Documents | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code |