Paty Hall Renovation
- 210 McCorvey Drive, Tuscaloosa, Alabama 35487
Use
Residential
Status
Construction Type
Renovation
Current Phase
Complete
College or Division
Division of Student Life
Bed Count
400
CA Filing Code
247-18-1818
Project GSF
90,384
Bid Date
January 10, 2019
Construction Start
February 2019
Construction End
20190801
COSC Date
' July 26, 2019
Project Architect
Ward Scott Architecture
General Contractor
WAR Construction
Project Manager
Steven Mercado (8-4640)
Field Coordinator
Jon Chesnut (8-1684)
Interior Designer
Leah Shepherd (8-8450)
Project Admin
Brittney Fox (8-5577)
The Interior Renovation Package completed on July 26, 2019.
The Exterior Stairwell and Improvements package bid on November 7, 2019 and is scheduled for construction over summer 2020.
BOT Budget
$14,370,000.00
Funding Sources
-
Housing and Residential Communities Reserves :
$14,370,000
Banner/Project #
90845
Project Accountant
Demon Patrick (8-8714)
STAGE | PACKAGE INFORMATION |
---|---|
Stage 1 |
|
Stage 2 |
|
Stage 3 |
|
Stage 4 |
|
-
January 10, 2019
Renovation Package -
November 7, 2019
Exterior and Stairwell Improvements
DATA LABEL | DATA VALUE |
---|---|
Category | Residential |
College/Division | Division of Student Life |
Bed Count | 400 |
Status | Active |
Construction Phase | Complete |
Construction Type | Renovation |
GSF | 90,384 |
Street Address | 210 McCorvey Drive, Tuscaloosa, Alabama 35487 |
Zone | 2 |
Project Number | 247-18-1818 |
Architect | Ward Scott Architecture |
Project Manager | Steven Mercado (8-4640) |
Project Admin | Brittney Fox (8-5577) |
Field Coordinator | Jon Chesnut (8-1684) |
General Contractor | WAR Construction |
Interior Designer | Leah Shepherd (8-8450) |
Bid Date | January 10, 2019 |
Construction Start | February 2019 |
Scheduled Construction End | 20190801 |
Fundraising Site | |
SharePoint Active Project Site Link | https://uafinancialaffairs.sharepoint.com/sites/7M27T/247-18-1818/SitePages/Home.aspx |
AiM Link | https://fmax.fa.ua.edu/fmax/screen/PROJECT_VIEW?project=90845 |
Campus Map Link | |
BIR Building Link | https://uafinancialaffairs.sharepoint.com/sites/98C3D/Zone2/buildings/247 |
Construction Photos Link | https://uafinancialaffairs.sharepoint.com/sites/7M27T/247-18-1818/Project%20Photos/Forms/Thumbnails.aspx?viewid=f5bbcb8c%2D678f%2D4926%2D8fe9%2D9250ef706e52 |
Project Summary |
The Interior Renovation Package completed on July 26, 2019. The Exterior Stairwell and Improvements package bid on November 7, 2019 and is scheduled for construction over summer 2020. |
Renderings | |
Budget | 14370000 |
Banner Fund Number | 90845 |
Project Accountant | Demon Patrick (8-8714) |
Funding Source(s) | |
ePIRPAF Link | https://everest-sf.fa.ua.edu/Runtime/Form/Project%20Initiation%20Request/?_State=PIR_HISTORY&GUID=94B72EB1-4D55-4180-8847-0744D272C89D |
Construction Dashboard Link | https://spd.ua.edu/construction/Awards/Funds?fund=90845&detail=all |
View Bid Tab | https://constructionpublicinfo.ua.edu/wp-content/uploads/Public-Quick-Links/Certified-Bid-Tabs/Paty-Residence-Hall-Renovation-247-18-1818-1-10-19.pdf |
Link to eCORAF | https://everest-sf.fa.ua.edu/Runtime/Form/CORAFList |
Link to ePayApp | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+PayApp+Dashboard |
Stage 1 BOT Submittal(s) | |
Stage 2 BOT Submittal(s) | |
Stage 3 BOT Submittal(s) | |
Stage 4 BOT Submittal(s) | |
BOT Site | |
COSC Date | July 26, 2019 |
Year End Inspection | July 26, 2020 |
View Warranty Documents | |
Link to Awarded Contracts Dashboard | https://everest-sf.fa.ua.edu/Runtime/Form/Awarded+Contracts+Dashboard |
Link to Bid Site | https://constructionpublicinfo.ua.edu/bids/ |
Consultant Agreements | https://constructionpublicinfo.ua.edu/agreements/ |
Design Guidelines | https://constructionpublicinfo.ua.edu/design-guidelines/ |
Front End Documents | https://constructionpublicinfo.ua.edu/front-end-documents/ |
Instructions Link | https://constructionpublicinfo.ua.edu/public-forms/ |
Advertisement for Bids | |
Closeout Documents Link | |
RFQ Documents | |
Bid Tabulations | |
360 Embed Code |
The renovation upgraded Paty Hall and was completed in August of 2019. The exterior and stairwell improvement work will be completed over Summer 2020.